Laserfiche WebLink
MASHPEE FINANCE COMMITTEE MEETING MINUTES <br /> FEBRUARY 11, 1992 <br /> MEETING COMMENCED AT 7:00 P.M. <br /> Members present: Tony Gallo, Chairman, Deidre Greelish, Denise <br /> Sullivan, Al Polsi, Dan Goggin, John Ferriday <br /> Tony Gallo, Chairman, indicated that we would discuss the minutes <br /> of February 4, 1992 and February 6, 1992 after we heard from the <br /> School Building Needs Committee and the Waterways Commission. <br /> SCHOOT. BUILDING NEEDS COMMITTEE - <br /> Bill Jones, Chairman of the School Building Needs Committee was <br /> unable to attend the meeting, but Peter Dinizio, member of the <br /> School Building Needs Commttee was present and presented the <br /> Committee's request for a fifteen room addition to the Mashpee <br /> Middle School. Also present at the meeting for discussion were <br /> Lincoln DeMoura, Superintendent of Schools; Alec Matt, Member <br /> School Building Needs Committee; David Terry, Member School <br /> Building Needs Committee; Carole Dunivan, School Committee Member; <br /> Nancy Caffyn, Selectman. <br /> Peter Dinizio indicated that the two Mashpee schools were designed <br /> for a total of 1,000 students. Presently the schools are 140 <br /> students over this amount and they are expecting 185 more children <br /> will enroll in the Mashpee Public School System in September. The <br /> Committee looked at all of their options: 1) construction of a 600 <br /> student elementary school; 2) the addition of 15 classrooms to the <br /> Middle School; 3) utilization of the Davis School for 9 classrooms; <br /> 4) portable classrooms; 5) year round education; b) double <br /> sessions; and 7) increase class size to 30 plus students. Of these <br /> seven options, the School Building Needs Committee would like to <br /> see the 15 classrooms be added to the Middle School. This option <br /> is recommended because the Middle School already has existing <br /> modern facilities, eventually will be tranformed into a Jr/Sr. High <br /> School and for financial considerations. The financial <br /> considerations are that the addition will cost approximately <br /> 2,000,000.00 in costs, it will be a tax impact, capital improvement <br /> to the town, target date will be January 1993 for four classrooms <br /> rather than September 1993 and an elementary school atmosphere. <br /> One concern of the parents was that younger children will be mixed <br /> in with much older children. Peter Dinizio then went on explain <br /> that the way the addition is -designed the younger children will <br /> have their own bus stop and will be separated from the older <br /> children. Carlson Engineering has constructed these plans, so far, <br /> free of charge. The estimated total project cost for the addition <br /> is $2,015,300.00. This figure, of course, does not include the <br /> cost of staffing, furniture, or any other costs the school will <br /> need to operate like utility costs, etc. The long range plan to <br /> preserving the school system would be that a new elementary school <br />