My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1993
>
1993-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 7:15:06 PM
Creation date
11/17/2016 3:30:46 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
12/31/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> merit of two appraisals and the need to know what the Committee would <br /> get for the $40,000. Mr. Greelish amended the motion. The amended <br /> motion was to ask Mr. Coleman and Mr. O'Leary to submit definite <br /> • appraisal costs for Site A and Site B. Seconded by Ms. Ahlgren. ALL IN <br /> FAVOR. <br /> Engineering Presentations <br /> Representing Strekalovsky & Hoit, Inc. were the following: <br /> Roger O. Hoit, President <br /> Vicevold O. Strekalovsky, Treasurer <br /> Daniel P. Bradford, Project Architect <br /> John A. Calabro, Educational Consultant <br /> Richard Cook, V. Pres., Site Engineering, The BSC Group <br /> This group gave a presentation on the history of the firm and <br /> the design team; their previous experience with high schools; and on the <br /> proposed site selection study for the Mashpee High School. Their <br /> previous experience included Braintree High School, Tantasqua <br /> Regional High School, Hingham High School, Natick High School and <br /> Wayland High School. <br /> The firm of Drummey, Rosane, Inc. was represented by the <br /> following: <br /> • Carl Franceschi, Principal <br /> Pao-Chung Chi, Project Manager <br /> Gary Larson, Larson Associates (site, landscape and civil <br /> architects) <br /> DRA also gave a brief history of their company, citing public <br /> school design for 35 years. Their experience included analysis of twelve <br /> potential sites for a vocational high school in Holyoke. They also have <br /> created a set of criteria and developed a feasibility study matrix. Mr_ <br /> Franceschi presented the firm's sense of what the issues are in <br /> Mashpee. <br /> The firm of Gale Associates was represented by the <br /> following: <br /> Joseph Penney, Director of Civil Engineering <br /> Steven C. Habeeb <br />
The URL can be used to link to this page
Your browser does not support the video tag.