aul said the original budget has $125 , 000 for off site improvements. The <br /> own has to cut the curb and widen that section of Old Barnstable Road, at <br /> he school entrance. The bike path will be put in the EIR as some sort of <br /> ompromise. The EIR has been submitted and the Committee is obligated to <br /> o what is in it. <br /> eter asked for an estimate for the widening (extra lane) and bikepath? <br /> aul thinks they asked for 100 feet on each side. They will leave $125 ,000 <br /> n the budget until there is a determination of what exactly it will <br /> ntail . Is it in SMMA' s scope of work or not? Does the Committee pay them <br /> xtra? Paul is waiting a response from Town Counsel on these issues . <br /> his issue has to be researched by SMMA and the Committee ; start looking at <br /> he requirements to meet the EIR. It has to get done. <br /> d said off site work is generally not part of their scope of work . They <br /> ill get a proposal from VHB to get it underway. <br /> reg estimates 1 , 100 feet of bikeway will cost $20-30 , 000 . It has to be <br /> orked out how it will intersect with the entrance to the school , the <br /> sland , etc . They should work on a traffic plan for the entrance. If you <br /> ut more than 5 , 14" wide trees it is a MEPA filing . <br /> eter asked if the Committee wants to fight it? <br /> aul said he was advised it was a good compromise. It is worth a lot more <br /> o get the EIR completed on time than the cost of the sidewalk. <br /> e told SMMA the Committee needs to know the cost of the Old Barnstable Rd <br /> mprovements. <br /> OST ESTIMATE <br /> he Committee talked a little about the article in the 2/14/95 Cape Cod <br /> imes regarding the Brewster elementary school . Paul said he is concerned <br /> ecause this project has the same estimator as that one . <br /> d Frenette reviewed the cost estimate. <br /> onstruction Budget: $21 , 170 . 00 - $20 , 100 , 000 plus design changes and value <br /> dded . <br /> ff site improvements : $200, 000 - this is just reserved , it has not been <br /> Jefined. <br /> esign Development estimate, after approved reductions: $20 , 958, 561 . <br /> onstruction Documents Estimate - 2/14/95 : $21 , 793, 976 . <br /> Difference of: $ 835 ,415 . <br /> emaining editing : <br /> utdoor lighting alterations <br /> heatrical lighting to FF&E $203 , 591 additional reduction <br /> CTV to FF&E <br /> Balance of $631 , 824 . <br /> Paul is concerned about moving the theatrical lighting . Peter said it will <br /> become a choice between theatrical lighting and computers . <br /> Joel Seeley said the CCTV conduit and cabling is in the building as is the <br /> theatrical cabling and wiring . Sports lighting , the conduit and wiring is <br /> in that price given . There have been some adjustments made. <br /> 2 <br />