Laserfiche WebLink
SD-5 SOUTH PLUME <br /> RESPONSE TIMELINE (con't) <br /> ■ Dec 1997 - SD-5 Plume <br /> Response Decision <br /> — Recirculating Well tech <br /> (Alternative E) <br /> — Pull start-up June 1999 <br /> — 30% Plume into/beneath <br /> pond prior to June 1999 <br /> — 62% of remaining 70% (e.g . , <br /> 90%) captured and treated <br /> by Alternative E <br /> — Alternative E expedites <br /> aquifer restoration (4-5 yrs) <br />