Laserfiche WebLink
SD-5 SOUTH PLUME <br /> RESPONSE TIMELINE (coni) <br /> — Minimize impact to <br /> neighborhood <br /> ■ DEC 1997 (coni) <br /> - Need to address known data <br /> gaps <br /> • upper half of plume <br /> • conditions at proposed <br /> RW sites <br /> • plume/pond interaction <br /> • potential impact of plume <br /> at and beyond SE shore of <br /> pond <br />