My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/22/2016 BOARD OF SELECTMEN Minutes
>
8/22/2016 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2017 1:05:31 PM
Creation date
2/22/2017 1:05:12 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
08/22/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
10 <br />Board of Selectmen <br />Minutes <br />August 22, 2016 <br />Catherine Laurent, DPW Director: <br />Review and annroval of Chance Order #3. Route 151 Corridor Enaineerina Design: <br />Catherine Laurent, Director of Public Works was in attendance to request the Board support Change <br />Order #3 to the agreement for the engineering design contract for reconstruction and improvements to <br />Route 151. The total amount of the change order is $236,713.12 to be earmarked for the development <br />of required ROW plans due to anticipated construction impacts which include the structural design of <br />three boardwalks required to cross wetlands, the structural design of seven masonry retaining walls <br />needed as a result of topography and wetlands and additional engineering related to environmental <br />permitting. <br />Ms. Laurent indicated the Town through the Cape Cod Transportation Improvement Plan is <br />responsible for the project engineering and design. Costs would be assumed through Chapter 90 <br />funding. The Town of Mashpee receives approximately $600,000 per year in Chapter 90 funding. The <br />balance in this account is approximately $3 million. With MassDOT approval, the $9.2 million <br />construction project would be paid through the TIP program. <br />It was noted the Town approved the conceptual plan for this project at their April 2, 2015 meeting. <br />Plans include the extension of the existing multi -use path located on the north side of Route 151 at the <br />Old Barnstable Road intersection to the Town line, and a 5' sidewalk from Old Barnstable Road to <br />Winslow Drive. <br />Temporary construction easements are needed from private properties to develop the ROW plans in <br />accordance with MassDOT requirements. The extension on the multi -use path will provide a <br />continuous 10' off-road path from the Town Line to Market Street at Mashpee Commons. The project <br />is currently scheduled for construction in 20202021. <br />Acceptance of this change order will increase the contract to $578,213.12 for engineering design <br />through 25%. An additional change order will be required for work through 100% of the <br />design/construction plans. Any increase in construction costs would be absorbed by the TIP program. <br />This project will provide for safe accommodations for pedestrians and recreational bicyclists in multi - <br />neighborhoods adjacent to Route 151, and support the access to all three Mashpee Schools, the <br />Mashpee Public Library, the Mashpee Senior Center, the Boys and Girls Club and numerous <br />businesses. <br />In addition to promoting public safety, Rodney C. Collins, Town Manager recommended the Board <br />move forward with this change order to accommodate the design requirement of Mass DOT. The <br />project will nearly complete the Mashpee corridor with the exception of access to the Barnstable <br />County Fairgrounds. It was noted there is a delay as the Town of Falmouth is not moving forward <br />with this project at this time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.