Laserfiche WebLink
Special Town Meeting (Art. 12 continued)May 2, 1977 387 <br />1. New construction or substantial improvement*(repair, construction <br />or alteration costing 50% or more of the market value of the structure <br />before improvement, or if damaged, before damage occurred) of residential <br />structures shall have the lowest floor (including basement) elevated <br />tonot less than base flood elevations, New construction or sub- <br />stantial improvement of nonresidential structures shall either be <br />similarly elevated or, togerther with attendant utility and sanitary <br />facilities, be floodproofed tonot less than base flood elevations. <br />*(Substantial improvement will bave been deemed to occur when the <br />first alteration of any structural part of the building commences.) <br />' 2. Where floodproofing is required in accordance with Section 1, <br />a registered engineer or architect shall certify that the flood - <br />proofing methods are adequate to withstand the flood depths, pressures, <br />velocities, impact and uplift forces, and other factors associated <br />with the base flood. <br />3. Any new construction or substantial improvement of be undertaken <br />within said zones shall be in accordance with the Nassachusetts <br />Uniform Building Code, Section 748.0 as amended. The Building Inspector <br />shall (a) review all proposed development within the folld zones to <br />assure that all necessary permits which are obtainable at such time <br />have been received from those governmental agencies from which approval <br />is required by Federal or State Law, including Section 404 of the <br />Federal Water Pollution Control Amendments of 1972, 33 U.S.C. 1334. <br />(b) obtain and maintain records of elevation and floodproofing levels <br />for new construction or substantial improvement within the flood zones. <br />4. No land within areas designated as V (velocity) Zones on the F.I.A. <br />Flood Rate Maps shall be developed unless such development is demonstrated <br />by the applicant to be located landward of the reach of the mean <br />high tide. Not withstanding the applicable provisions of the Mass- <br />achusetts Uniform Building Code, all new construction and substantial <br />improvement within the V zones shall be (a) elevated on adequately <br />anchored pilings or columns, and securelt anchored to such piles <br />or columns so that the lowest portion of the structural members of <br />' the lowest floor (excluding the pilings or columns) is elevated <br />to or above the base flood elevation; and (b) certified by a registered <br />professional engineer or architect that the structure is securely <br />anchored to adequately anchored pilings or columns in order to with- <br />stand velocity waters and hurricane wave wash. The following shall <br />be prohibited within said V zones. <br />(A) Any mam-made alteration of sand dumes which might increase <br />the potential for flood damage. <br />(B) Usa;-of fill for stuctural support for new construction or <br />substantial improvement of structures. <br />(C) Mobile homes (except in existing mobile home parks and <br />existing mobile home subdivisions). <br />5. The Zoning Board of Appeals may authorize a use variance within <br />the flood areas, as in any other zoning district within the Town of <br />Mashpee, and may very the restractions and requirements set forth <br />in this section in the case of new structures or where there is <br />to be substantial improvements or other development on a lot of <br />one-half acre in size or less, contifuous to and surrounded by lots <br />with existing structures constructed below the base flood elevation, <br />provided the following are met: <br />A. A Showing of good and sufficient cause. <br />' B. A determination that failure to grant the Special Permit <br />would result in exceptional hardship to the applicant. <br />C. A determination that the granting of the Special Permit will <br />not result in increased flood heights, additional threats <br />to public safety, extraordinary public expense, or any conflict <br />with requirements in accordance with Chapter 40Aj, of the <br />Massachusetts General Law, and <br />D. The Zoning Board of Appeals has notified the applicant for <br />the Special Permit in writing, that the actuarial rates will <br />increase as the first floor elevation level increases risks <br />to life and property. <br />6. <br />