My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/6/2017 BOARD OF SELECTMEN Minutes
>
3/6/2017 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2018 9:39:46 AM
Creation date
9/8/2017 1:41:53 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
03/06/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3 <br /> Board of Selectmen <br /> Finance Committee/School Committee <br /> Minutes <br /> March 6, 2017 <br /> Discussion relative to the Quashnet School Door, Window and Roof Project: (continued) <br /> Mr. Sivalogan informed the respective boards the MSBA has accepted the new project scope. In further <br /> surveying the existing building and reviewing regulations imposed by the MSBA, several updates are <br /> proposed to conform to code requirement, accessibility and compliance with MAAB. Remedial design <br /> improvements include updating restrooms with handicap accessibility modifications, improving <br /> stairways, raising a drinking fountain and adjusting doorways for proper clearance. Additional work as <br /> required for compliance is estimated to cost $300,000 to $400,000. <br /> Additionally there was an issue detected in the roof joints. Current and new codes require a higher wind <br /> restraint. Therefore is it anticipated 135 areas would be required to be welded. Mr. Sivalogan indicated <br /> the building envelope would be weatherproofed, fully MAAB compliant and energy efficient. The <br /> construction project as it is presently designed involves 86% of the building. The result would offer the <br /> Town an essentially new exterior with a surface life of 40 years. The remainder of the building consists <br /> of brick and masonry that is deemed in very good condition requiring no alteration. <br /> If was reaffirmed the 28 year old roof is beyond its use of life. The roof replacement would include a 30 <br /> year warranty. Highlights of the project include the replacement of the windows and doors with <br /> aluminum impact resistant windows, aluminum and fiberglass doors, MAAB accessibility upgrades and <br /> the replacement of the EFIS soffits with upgrades to the EFIS system. <br /> The duration of the project is proposed in April at the start of school vacation through November, 2018. <br /> Additional project assumptions include work to commence on a second shift when school is not in <br /> session. It was recommended the project be bid under a single contractor as there are multiple trades to <br /> be coordinated. <br />
The URL can be used to link to this page
Your browser does not support the video tag.