My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/16/1972 PLANNING BOARD Minutes
>
2/16/1972 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2017 2:12:00 PM
Creation date
9/26/2017 2:11:58 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
02/16/1972
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2 - <br /> A public hearing was held on the proposed town meeting article <br /> to rezone the area surrounding Mashpee Lake from R2 to R1. Nobody <br /> appeared at the hearing to discuss this article, therefore, the board <br /> decided to proceed with this rezoning and to submit it to the town <br /> meeting for its action. <br /> Mr. Richard Ferriera submitted a preliminary plan for Mr. Vincent <br /> Porciellio covering 7.8.6 acres surrounding a Cranberry Bog adjacent <br /> to Jehu Pond. It proposed cluster zoning. The board gave its tentative <br /> approval subject to providing the necessary frontage for all lots on <br /> a paved road. The board also stipulated that a topographic layout <br /> with 2 foot profiles should be provided. A 20 foot right of way to <br /> Jehu Pond is also to be provided. <br /> Mr. Chris Burden of New Seabury Corporation picked up the signed <br /> original for the extension of Shore Drive. <br /> The public hearing for the subdivision off Gleneagle Drive, which <br /> had been continued from the previous meeting was completed. Nobody <br /> appeared in opposition. The road grade had been reduced as suggested <br /> by the board, therefore the board indicated its approval. <br /> Definitive plans were submitted for subdivisions on Morgan Circle <br /> `. and Hunt Circle. The Hunt Circle profiles will be revised to show an <br /> additional pair of leaching basins. Both profile plans will show <br /> berms where required. A public hearing was scheduled for March 15. <br /> The meeting adjourned at 10:45 P.M. <br /> Respectfully submitted, <br /> Earle Marsters, Chairman <br />
The URL can be used to link to this page
Your browser does not support the video tag.