Laserfiche WebLink
t 1lashpee Zoning <br /> Board of Appeals Scott Rigsby ,+ <br /> SP-03- 1 <br /> . will not cause excessive demand on community facilities. <br /> . will not significantly decrease surface or groundwater quality or air quality. <br /> . will not have a significant adverse impact on-wildlife habitat, estuarine <br /> systems, traffic flow, traffic safety, waterways, fisheries, public lands or <br /> neighboring properties. <br /> . will not cause excessive levels of noise, vibrations, electrical disturbance, <br /> k <br /> x <br /> radioactivity or glare.. _ <br /> t ' <br /> . will not destroy or disrupt any species listed as rare, endangered or threatened <br /> by the Massachusetts Natural Heritage Program or any known historic or <br /> 07,atchaeologic site. t f <br /> 8. will.properly dispose of stumps, construction debris, hazardous materials and <br /> other waste. 1 T... <br /> 1 1 4 <br /> . will provide adequate off-street parting. <br /> 10. will not cause,excessive erosion or cause increased runoff onto neighboring <br /> properties or into any natural river, stream, pon. d or water body and v'11 not 4 <br /> otherwise be detrimental'to the town or the'area. <br /> , <br /> * 4 i + <br /> 11, will be an improvement with installation of a new Title V septiO system. <br /> 12. the proposed structure will he farther away from the wedands.than the existing <br /> structure. <br /> • <br /> 13. while the proposed structure will increase the non-conforming nature of the <br /> structure, the changes will not result in a structure or use which is more <br /> detrimental to the neighborhood than the prior non-conforming structure and <br /> its use. a <br /> In view of the foregoing, the Ma.shpee Zoning Board of Appeals found that the <br /> 7. <br /> applicant met the criteria necessary for the granting of a Special Permit. Upon notion <br /> duly made and seconded, the zoning Board of Appeals voted unanimously on May 14, <br /> s - <br /> 2003 to grant a Special Permit, The Special Permit is conditioned upon compliance with <br /> the proposed site plan from <br /> A ' <br /> LiL <br /> 1 <br /> L <br />