My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/11/2003 ZONING BOARD OF APPEALS Minutes
>
6/11/2003 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2022 3:41:09 PM
Creation date
12/4/2017 3:10:32 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
06/11/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mashpee Zoning <br /> Board of Appeals Mary J. Counts <br /> 2SP-03-88 <br /> "Conversion of an existing dwelling to accommodate not more than to 2 families, <br /> provided that there is not external evidence of occupancy by more than one 1 family, <br /> and further provided that each dwelling unit resulting from such conversion shall have <br /> not less than seven hundred fifty o square feet of habitable floor space" <br /> SPECIFIC FINDINGS <br /> The Board determined that: <br /> 1. conversion of an existing dwelling to accommodate not more than two 2 families, <br /> provided that there is no external evidence of occupancy by more than one 1 family, <br /> 2. and further provided that each dwelling unit resulting from such conversion shall <br /> have not less than seven hundred fifty o square feet of habitable floor space. <br /> In view of the foregoing,the Ma.shpee Zoning Board of Appeals found that the <br /> applicant met the criteria necessary for the granting of a Special Permit. Upon notion <br /> duly made and seconded,the Zoning Board of Appeals voted unanimously on June 11, <br /> 2003 to grant a Special Permit to complete the accessory structure as permitted by the <br /> requested relief sought. The Special Permit is granted in perpetuity and is conditioned <br /> upon the execution of all of the requests in the attached letter from the Fire Department <br /> and pians from Cape & Islands Engineering, as prepared for lass Bay Construction, <br /> dated August 10, 1999. <br />
The URL can be used to link to this page
Your browser does not support the video tag.