Laserfiche WebLink
4 <br /> Capital Improvement Program Committee <br /> Minutes <br /> December 9,2016 <br /> Police: (continued) Lease of Police Vehicles - $223,000: <br /> It was disclosed there have been several issues with the Dodge Chargers under warranty. The <br /> Police Department is currently reviewing this matter as well as options to secure a different <br /> manufacturer for vehicles. In the evaluation process of Police vehicles,utility vehicles similar to <br /> what is being used by the State Police are under consideration. All vehicles would be used as a <br /> trade to offset costs, and the State bid would be sourced in the process. <br /> Discussion followed with regards to cost estimates projected for lease of 10 Police vehicles <br /> within the FYI Vehicle Replacement Program. Chief Carlin indicated he would attempt to <br /> expedite the comparison review of Police vehicles to assist the CTP with their determination. <br /> The study is proposed to be completed in one month or less and a report would be submitted in a <br /> timely manner to the CIP. <br /> COMMUNICATIONS & CORRESPONDENCE <br /> Information Technology: <br /> At the last meeting,the CIP reviewed the method of protecting the networking equipment with a <br /> chemical fire suppression system. The cost projection inadvertently considered a price of <br /> $32,000. The quote was clarified as it was not intended for dry chemical, but to configure the <br /> sprinkler system to not trigger unless the smoke detector was activated. A cost of$200,000 has <br /> been determined to install a dry chemical suppression system in the IT room. <br /> Switch/NAS for Fire Department: $10,000: <br /> The IT Director has requested the CIP consider adding the $10,000 Switch for the Fire <br /> Department to mirror the NAS Unit for the Fire Department. <br /> NEXT SCHEDULED MEETING <br /> As in normal process,the CIP Committee will prioritize projects at their next meeting. <br /> It was determined the Finance Director would compose a spreadsheet of the capital projects to <br /> define what is clearly obligated, and what projects would be considered and identified for <br /> funding by an outside source. The review would include projects designated for postponement. <br /> The CIP agreed to defer the next meeting to await additional information from the Police <br /> Department regarding the type and cost of vehicles to be presented in the Police Vehicle <br /> Replacement Program, review of the Town Vehicle Pool and to obtain cost estimates for the <br /> installation of Fire Hydrants. <br />