My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/13/2017 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
2/13/2017 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2017 5:00:41 PM
Creation date
12/21/2017 10:59:15 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
02/13/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�,64L. <br /> Masbpee Planning and Construction Committee <br /> Minutes of Meeting Held Monday,February 13,2017 <br /> Masbpee Torun Hall–Popponesset Meeting Room <br /> Committee Members Present: Steve Cook,Joe Brait, and Scott McGee. <br /> Absent: Tom O'Neill. <br /> Also Present: Catherine Laurent, DPW <br /> Patty DeBoer, School Superintendent <br /> Chairman Steve Cook called the meeting to order at 5:15 p.m. <br /> Approval of Minutes <br /> Joe Brait motioned to accept the minutes of the Meeting of November 1,2016; Scott McGee seconded the <br /> motion. <br /> Vote: 3 Yes. <br /> Steve Cook,yes. Joe Brait,yes. Scott McGee,yes. <br /> Old Business <br /> Update on MSBA Accelerated Repair Program(window/roof project at QS) <br /> Catherine Laurent reported: <br /> • Scope of the project was expanded to include replacement of the roof,which was approved by a <br /> joint meeting of the Board of Selectmen and the School Committee. <br /> • Looking at March 15 date for submission of the schematic design plan. Steve Cook asked if any <br /> schematic plans done;Catherine responded that none done yet. <br /> • If approved, June-2018 would be construction start date. <br /> • Town has to approve 100% of the funding even though we should be eligible for 38% <br /> reimbursement. <br /> • Funding must be approved at May-2017 Town Meeting; project must be approved by MSBA at <br /> May 21,2017; target date of November-2017 to go out to bid;and construction to start in June- <br /> 2018. <br /> • MSBA requires school to be 100%accessible—this will add 400,000 to 450,000 to the project to <br /> bring bathrooms in compliance----Tone toilet in each bathroom has to be accessible. Bathroom <br /> sizes are okay, but accessible toilet stalls need to be enlarged to comply with required dimensions <br /> for turning. <br /> Decisions to be made: <br /> Have to define roofing materials. The Subcommittee met today and decided to stick with rubber <br /> membrane roof. <br /> Catherine said there are 3 different options for the soffit: <br /> 1. EFIS–which is there now and is the least costly. Catherine said this is Styrofoam with stucco <br /> finish. <br /> 2. Aluminum finish. <br /> 3. Phenol composite finish. More color choices with Aluminum and Phenol finish. <br />
The URL can be used to link to this page
Your browser does not support the video tag.