My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/14/2016 CONSERVATION COMMISSION Minutes
>
1/14/2016 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2017 5:00:22 PM
Creation date
12/27/2017 12:12:40 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
01/14/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
float for off season storage over any wetland resource areas and he <br /> recommended a close and issue. <br /> It was suggested by,Mr. Sweet that the phragmites be addressed on both sides <br /> of the dock. Mr. Costa stated he would have that conversation with the <br /> applicants. The Agent said it is premature at this point to consider an amended <br /> order. It would depend on the discussions and what is being proposed. This <br /> could be taken up at a later time as an amendment to the order or an <br /> administrative review. <br /> No comment from the public <br /> Motion: Mr. Sweet moved to close and issue, seconded by Mr. Rogers. Vote <br /> unanimous 5-0 <br /> 6:03 Antonio and Helen Donato, 18 Cricket Way, Proposed construction of <br /> pier, ramp and float structure and retaining wall. NOI <br /> Resource Areas: <br /> Mr. Costa, Cape and Island Engineering, represented the applicant. He <br /> requested a continuance on behalf of the applicant. <br /> Motion: Mr. Sweet moved to continue the hearing at the request of the applicant <br /> to January 28, 2016 at 6:03 p.m., seconded by Mr. Rogers. Vote unanimous 5-0 <br /> 6:06 Ronald A. and Charlene A. Weekley, 38 Bluff Avenue. Proposed septic <br /> system upgrade. RDA <br /> Resource Area: <br /> Peter McEntee, Engineering Works, represented the applicants. He explained <br /> the work will consist of locating, pumping and filling or removing the existing <br /> cesspools. A new septic system will be installed as indicated on the plan <br /> provided. The areas that are disturbed will be restored with loam and seed. <br /> The Agent noted the application has been submitted to the Board of Health and <br /> is under review for a 3 bedroom dwelling. He showed some images of the <br /> property. The Agent recommended a negative determination. <br /> No comment from the public <br /> Motion: Mr. McKay moved a negative determination, seconded by Mr. Rogers. <br /> Vote unanimous 5-0. <br />
The URL can be used to link to this page
Your browser does not support the video tag.