Laserfiche WebLink
QUASHNET ELEMENTARY SCHOOL Building- Estimate Detail <br /> Window Replacement&Associated Work <br /> Mashpee,MA <br /> CONSTRUCTION BUDGET COST REPORT <br /> September 13,2016 <br /> Quantity Unit Rate Total <br /> C3030 CEILING FINISHES <br /> Ceiling finishes <br /> Acoustical ceiling the <br /> Modify existing ceiling to facilitate window <br /> replacement 1,427 LF 15.00 21,405 <br /> Subtotal $21,405 <br /> E2010 FIXED FU NISH <br /> Window treatments <br /> Blinds 7,320 SF 13.00 95,160 <br /> Subtotal $95,160 <br /> F20.10 BUILDING ELEMENTS DEMOLITION <br /> Exterior demolition <br /> Weather protection at windows 7,320 SF 4.00 29,280 <br /> Remove existing windows,attachment clips and <br /> interior cladding 7,320 SF 5.00 36,600 <br /> Removal of louvers 179 SF 10.00 1,790 <br /> Remove existing window treatments 7,320 SF 0.50 3,660 <br /> Subtotal $71,330 <br /> F2020 HAZ4RD0US COMPOJIENTS ABATEMEN <br /> Hazardous materials abatement <br /> Allowance 1 LS 200,000.00 200,000 <br /> Subtotal $200,000 <br /> MARKUPS <br /> General conditions and project requirements <br /> General conditions and requirements 6.0 MTH 40,000 240,000 <br /> Bond and Insurance 2.00% 1,987,540 39,751 <br /> Building permit 0.00% 21027,291 <br /> Overhead and Profit <br /> Contractors overhead and profit(Fee) 5.00% 2,027,291 101,365 <br /> Subtotal $381,116 <br /> CONTINGENCIES ESCALATION <br /> Contingencies <br /> Design contingency 20.00% 2,128,656 425,731 <br /> GMP contingency 0.00% 2,554,387 <br /> Escalation <br /> Escalation to Start Date(September 2017) 5.79% 2,554,387 147,899 <br /> Subtotal $573,630 <br /> �cnness� <br /> mina Page 10 <br />