Laserfiche WebLink
Chapter 2 – Hazard Mitigation Plan (continued) <br /> The group then went through 10 Hazard Profiles item-by-item and labeled probability of occurrence <br /> for Mashpee—for example: <br /> • Unlikely: less than a 1% probability over the next 100 years. <br /> • Possible: 1-10% probability in the next year or at least one chance in the next 100 years. <br /> • Likely: 10-100% probability in the next year or at least one chance in the next 10 years. <br /> • Highly Likely: near 100% probability in the next year. <br /> The Hazard Profile pertaining to Coastal Erosion (item 11) was not addressed; this will be addressed <br /> by Conservation Agent. <br /> Critical Facility List <br /> The Critical Facility or Infrastructure list was reviewed. Addresses listed were all wrong; needs to be <br /> redrafted. <br /> ACTION ITEMS <br /> • Survey to be done on Town website. Assistant Town Manager and IT Director to work with <br /> Cally on this. <br /> • Cally will draft Critical Facility List and then meet with Catherine Laurent, DPW Director. Cally <br /> will also meet with Police and Fire Departments.. <br /> • Cally said she will take this data and Assessor's data and overlay to evaluate number of <br /> building/types of buildings in hazard areas. <br /> • Cally said she will present draft update next time she meets with this group. <br /> Adjournment... <br /> Jack Phelan motioned to adjourn the meeting; Scott Carline seconded the motion; and the motion <br /> was unanimously passed. The meeting adjourned at 11:10 a.m. <br /> Respectfully submitted, <br /> fJ an Giliberti <br /> ecording Secretary <br /> Document List <br /> Color Scheme of Building <br /> Color Chart <br /> Lighting Fixtures Spec List <br /> Draft Chapters 1 and 2 Hazard Mitigation Plan <br /> Draft Critical Facility List <br /> Draft hazard planning survey <br /> 4 <br />