My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/28/2016 CAPITAL IMPROVEMENT PROGRAM Minutes
>
1/28/2016 CAPITAL IMPROVEMENT PROGRAM Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2018 11:49:05 AM
Creation date
1/2/2018 11:48:37 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CAPITAL IMPROVEMENT PROGRAM
Meeting Document Type
Minutes
Meeting Date
01/28/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
F <br /> 5 <br /> Capital Improvement Program Committee <br /> Minutes <br /> January 28, 201 <br /> School W Network Core Switch Replacement 70,000; <br /> ^..� <br /> School Technology Director Sean Maroney met with the CIP Committee to review <br /> estimated disbursements for the Network Core switch Replacement program., Last year, <br /> the CIP deferred the network core switch replacement program due to funding <br /> c onstrai ts. <br /> For the past few years,the CIP funded the VA'xeless improvement project which is no <br /> deemed complete. In this program, 90 access points were installed at the Middle-High <br /> School,40 were installed at the Quashnet School and 30 have been installed at the I .C. <br /> Coombs School. The project received CIP funding through the MCAT progra.rn. <br /> In moving forward,the sum of$70,000 is requested to fund the first year of a 4-year <br /> replacement program. Last year the core switch replacement project was presented as a <br /> project to cost$50,000 per year. The proposal has increased as a result of a new cost <br /> estimate. The total cost for the next four years is 0,000. <br /> Discussion followed with respect to surplus funding the schools may have at the end of <br /> the current fiscal year. If possible,F 1 funding for this project would be secured from <br /> excess school monies. <br /> It was noted thatprojects such as this are required to go through the capital process. If an <br /> additional funding source is obtained, it is permissible for use through the capital <br /> program, The Town Manager recommended the CIP table:this project to further review <br /> the outcome of the remaining FY16 surplus school f-anding. <br /> Upon review, it was agreed the Network Core Switch Replacement project identified in <br /> the CIP Program would continue as committed, and be listed on the drab of capita items <br /> proposed for fimding in.FYI 7 with a fi ding source to be determined. <br /> It was noted that most of the school's technology projects are supported through the <br /> Network Administrator's IT operating budget. <br /> As it past practice, it was recommended the CIP Committee conduct the interview <br /> process, and schedule a separate meeting to deliberate and identify funding sources on the <br /> capital projects as proposed. <br /> 4: 0 p.m.. Mr. Gottlieb left the meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.