My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/25/2017 ZONING BOARD OF APPEALS Minutes
>
1/25/2017 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2018 10:11:47 AM
Creation date
1/5/2018 9:37:33 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
01/25/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br />MEETING MINUTES <br />JANUARY 25, 2017 <br />This lot is 15,000 square foot lot and has 112 feet of frontage along Waterline. Currently <br />the dwelling is a three (3) bedroom residential structure, and will increase to four (4) <br />bedrooms. The project is located in the Little Neck Bay sub -division which is a cluster sub- <br />division which means that the generally accepted rules that relate to the R-3 zoning district <br />do not apply. Typically in an R-3 zone requires a 20% maximum lot coverage, but in this <br />cluster zone it can increase to 30%, and lot area is reduced from 40,000 square feet to <br />15,000 square feet. The frontage can be reduced from 150 ft. to 75 ft. The front yard setback <br />is reduced from 40' to 30', and the rear yard. setback is increased from 15' to 20'. The side <br />setbacks remain the same at 15 ft. <br />The plan shows that the dwelling is getting closer to the front line, and decreasing the <br />setback in the front yard from 40.8 ft. to 31 ft., but still within the 30 ft. setback required. <br />The lot coverage is increasing from 25.1% to 29.2% but still conforms to the maximum <br />30%. There is a non -conformity in this building which is located at the very rear corner of <br />the southwest corner of the structure which is 9.1 ft. There is a stairway that will be <br />removed from this corner and replaced with deck, but will increase to 10.2' reducing the <br />existing non -conformity. <br />Mr. Kirrane said that one of the photos depicts a jog on the southerly side of the building <br />behind the existing garage which will be filled in with additional living space of the first <br />floor to accommodate a laundry and mudroom. There will also be a sunroom and decks <br />added. The distance from the wetlands will remain the same and was approved by the <br />Conservation Commission. The Board of Health will require a septic inspection before the <br />building permit is issued. The proposal is not creating a condition that is substantially more <br />detrimental to this neighborhood, and there is adequate parking and setbacks as required <br />by the Section 174-17 of the bylaws. <br />Tom Bunker with BSS Design noticed that the plot plan does not show drywells but was <br />not a condition by Conservation. They wouldn't fit in the front because of the septic system. <br />This might have been an oversight on both BSS and Conservation. A new septic tank will <br />be installed further from the house and connecting to the existing leaching area. <br />Mr. Goldstein commented that drywells might not be required if doing renovations as <br />opposed to new construction. <br />Mr. Bonvie read the Board of Health comments into the record. <br />Chairman Furbush read the Inspection Department and Conservation comments into the <br />record. <br />Mr. Goldstein asked if the stairs on the corner of the landing count as lot coverage and <br />would like clarification from the Building Inspector. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.