Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br />MARCH 9, 2016 <br />MINUTES <br />Chairman Furbush read the comments from the Conservation Department into the record; <br />"This project has received a permit from the Conservation Cominission. One tree will be <br />removed in close proximity to the proposed pool expansion. As compensation for this, a <br />new tree (native hardwood) will be planted closer to the edge of the wetlands/shoreline <br />where mitigation currently exists from previous projects." <br />Chairman Furbush read the comments from the Inspection Department into the record; <br />"The area is zoned R3 and is in the Pre -contact Archaeology Sensitivity area — listed as <br />"High Sensitivity". The applicant is seeking a modification to remove an existing spa and <br />replace it with an in -ground swimming pool and a spa. This department does view an in - <br />ground swimming pool as a structure and counts towards lot coverage." <br />Mr. Bonvie made a motion to issue a modification with the following conditions; the <br />comments from the Inspection and Conservation Departments and referencing a plot plan— <br />Proposed <br />lanProposed Swimming Pool prepared by BSS Design Engineering & Surveying. Prepared <br />for Brian Clark, 138 Waterway, New Seabury, MA. Scale 1" = 20', dated November 22, <br />2015, drawn by: EJP, TJB, Checked by: TB, Job Number 14145, Revisions: Added <br />Phoenix Group Plan and adjusted patio limit Dec. 30, 2015, TJB, Added Dimensions and <br />Areas of Planting Beds, Feb. 23, 2016. Title: Site Plan, Page 1 of 1, Drawing Number B23- <br />87. <br />Mr. Blaisdell, seconded, Mr. Gould, yes, Mr. Furbush, yes, Mr. Goldstein, yes, and Mr. <br />Bonvie yes. All were in favor of the 138 Waterway minor modification pool expansion. <br />NEW HEARINGS <br />25 Sand Dollar Lane: Owners, Aldo R. and Sandra P. Esposito request a Written Finding <br />under § 174-17 of the Zoning Bylaws to allow for construction of a 10' x 12' screened room <br />underneath existing deck on property located in an R-3 Zoning District (Map 105 Parcel <br />89), Mashpee, MA. <br />Mr. Darrell Chapman represented the homeowners for the proposal of the screened room <br />underneath the existing deck. It will be built onto a blue stone patio, and the screens will <br />be installed top to bottom 30" by 80". The frame will be 4'x 4', pressure treated polls with <br />2' x 4' pressure treated top and bottom plates. There is no excavating. The ceiling is a PVC <br />board system that will be attached to gutters with down spouts painted white. The structure <br />will not be built beyond the existing deck of the walk -out basement. <br />Chairman Furbush read the Inspection Department comments into the record; "The area is <br />zoned R3 and is in the Pre -contact Archaeology Sensitivity area — listed as "High <br />Sensitivity". The applicant is seeking a Written Finding under Article V §174-17 to <br />construct a 10' x 12 screened room which is being constructed underneath an existing deck. <br />The Board has to make the determination if this would increase the non -conforming <br />nature." <br />0 <br />