Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br />MARCH 23, 2016 <br />MINUTES <br />120 Summersea Road: Owners, James I. and Ellen B. Goodman request a Special Permit <br />under § 174-25.1(9) of the Zoning Bylaws to allow for construction of a dock, pier, ramp <br />and float extending more than 70 feet of coastal beach, coastal bank, salt marsh or <br />bordering vegetated wetlands, on property located in an R3 Zoning District, (Map 105 <br />Parcel 52), Mashpee, MA. <br />Mr. Kieran Healy, Land Surveyor with BSC Group represented the homeowners for their <br />dock project. The Zoning Board approved the house project earlier this year, and he was <br />told to file separately for the new dock. The plot plan he provided depicts the existing fixed <br />pier and the proposed ramp and float that was approved by the Conservation Commission. <br />The embankment leading to the dock is very steep and is only accessible by a rope. The <br />proposed new stairs will be 4 x 4 post construction and set into the ground on the upland <br />side and pilings set into the ground about 5 ft. below the mean high water with lag bolts <br />secured to the joists. The old shed will be replaced with a new shed in the same location, <br />and will be elevated about a foot and a half and bolted into the pilings. <br />Chairman Furbush read the Conservation comments into the record; "This project was <br />approved by the Commission. No issues". The Inspection Department comments; "The <br />area is zoned R3 and is in the Pre -contact Archaeology Sensitivity area --- listed as part in <br />both the "High Sensitivity" and "Moderate Sensitivity". The applicant is seeking a Special <br />Permit under §174-25 1 (9) regarding the construction of a dock, pier, ramp and float <br />extending more than 70 feet of coastal beach, coastal bank, salt marsh or bordering <br />vegetated wetlands." The Board of Health cominents; "no comment necessary". <br />Mr. Goldstein made a motion to approve the dock project; as noted in the Plan of Land, <br />120 Summersea Road, Mashpee, MA, Proposed Conditions, and February 17, 2016. Issued <br />for Permitting Not for Construction, Prepared for: James & Ellen Goodman, 46 White Oak <br />Lane, Sudbury, MA 01776. BSC Group, 349 Rte. 28, Unit D, W. Yarmouth, MA 02673, <br />Scale: 1" = 10', File: 9959-SP-3.DWG, DWG No: 6317-06, Job No.: 4-9959.00 Sheet 1 of <br />1. Mr. DeBarros seconded, yes, Mr. Furbush, yes, Mr. Blaisdell, yes, and Mr. Gould, yes. <br />All were in favor of the dock project. <br />OTHER BUSINESS <br />184 Monomosco Road: Received withdrawal letter dated March 17, 2016 from BSS <br />Design regarding Special Permit and Written Finding -Proposed Dock Petitions- Vote <br />Required. <br />Mr. Furbush read the withdrawal letter from BSS Design into the record and made a motion <br />to accept the withdrawal request. Mr. Blaisdell seconded, yes, Mr. Goldstein, yes, Mr. <br />DeBarros, yes, Mr. Pittsley, yes, and Mr. Gould, yes. All were in favor of accepting the <br />letter of withdrawal of the dock project sent by BSS Design. <br />3 <br />