MASHPEE ZONING BOARD OF APPEALS
<br />MARCH 23, 2016
<br />MINUTES
<br />120 Summersea Road: Owners, James I. and Ellen B. Goodman request a Special Permit
<br />under § 174-25.1(9) of the Zoning Bylaws to allow for construction of a dock, pier, ramp
<br />and float extending more than 70 feet of coastal beach, coastal bank, salt marsh or
<br />bordering vegetated wetlands, on property located in an R3 Zoning District, (Map 105
<br />Parcel 52), Mashpee, MA.
<br />Mr. Kieran Healy, Land Surveyor with BSC Group represented the homeowners for their
<br />dock project. The Zoning Board approved the house project earlier this year, and he was
<br />told to file separately for the new dock. The plot plan he provided depicts the existing fixed
<br />pier and the proposed ramp and float that was approved by the Conservation Commission.
<br />The embankment leading to the dock is very steep and is only accessible by a rope. The
<br />proposed new stairs will be 4 x 4 post construction and set into the ground on the upland
<br />side and pilings set into the ground about 5 ft. below the mean high water with lag bolts
<br />secured to the joists. The old shed will be replaced with a new shed in the same location,
<br />and will be elevated about a foot and a half and bolted into the pilings.
<br />Chairman Furbush read the Conservation comments into the record; "This project was
<br />approved by the Commission. No issues". The Inspection Department comments; "The
<br />area is zoned R3 and is in the Pre -contact Archaeology Sensitivity area --- listed as part in
<br />both the "High Sensitivity" and "Moderate Sensitivity". The applicant is seeking a Special
<br />Permit under §174-25 1 (9) regarding the construction of a dock, pier, ramp and float
<br />extending more than 70 feet of coastal beach, coastal bank, salt marsh or bordering
<br />vegetated wetlands." The Board of Health cominents; "no comment necessary".
<br />Mr. Goldstein made a motion to approve the dock project; as noted in the Plan of Land,
<br />120 Summersea Road, Mashpee, MA, Proposed Conditions, and February 17, 2016. Issued
<br />for Permitting Not for Construction, Prepared for: James & Ellen Goodman, 46 White Oak
<br />Lane, Sudbury, MA 01776. BSC Group, 349 Rte. 28, Unit D, W. Yarmouth, MA 02673,
<br />Scale: 1" = 10', File: 9959-SP-3.DWG, DWG No: 6317-06, Job No.: 4-9959.00 Sheet 1 of
<br />1. Mr. DeBarros seconded, yes, Mr. Furbush, yes, Mr. Blaisdell, yes, and Mr. Gould, yes.
<br />All were in favor of the dock project.
<br />OTHER BUSINESS
<br />184 Monomosco Road: Received withdrawal letter dated March 17, 2016 from BSS
<br />Design regarding Special Permit and Written Finding -Proposed Dock Petitions- Vote
<br />Required.
<br />Mr. Furbush read the withdrawal letter from BSS Design into the record and made a motion
<br />to accept the withdrawal request. Mr. Blaisdell seconded, yes, Mr. Goldstein, yes, Mr.
<br />DeBarros, yes, Mr. Pittsley, yes, and Mr. Gould, yes. All were in favor of accepting the
<br />letter of withdrawal of the dock project sent by BSS Design.