Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br />MEETING MINUTES <br />DECEMBER 14, 2016 <br />The plans and the photographs depict adequate space for parking. Mr. Gildea said that the <br />Building Inspector's comments are based on his interpretation that changing the sunroom <br />to be rebuilt into a kitchen would constitute the need to require a Variance and would be <br />less non -conforming. Mr. Gildea thought it would be more non -conforming. He also <br />thought it would reduce the lot coverage. Mr. Gildea said that the lot coverage is not going <br />up but going down as is the setback non -conformities in the front are going down. He <br />respectfully disagrees with the Building Inspector that variance relief is required. Mr. <br />Gildea said that non -conformities are not determined during the course of construction, <br />non -conformities are determined as it exists, and as is proposed. <br />Mr. Blaisdell read the Inspector Department comments into the record. <br />Mr. Bonvie asked if this piece of the property was being removed, and being torn down, <br />and then being rebuilt into a kitchen. <br />The Board had a discussion regarding the Inspector's comments and determined that it was <br />his comments and only his interpretation. <br />Mr. Goldstein noticed that the lot coverage on the Architect's plan depicts different figures <br />than on the plot plan submitted by BSS Design. Tom Bunker said that he doesn't think the <br />architect included the bulkhead. Mr. Bunker said he included the bulkhead. <br />Mr. Bonvie read the Board of Health comments into the record, and Conservation <br />comments into the record. <br />Mr. Bonvie made a motion to issue a Written binding with the following conditions; <br />1. The Board has determined that the applicant meets all the conditions of a Written <br />Finding under Mass General Law 40A Section 6. <br />2. Plot Plan- Proposed Additions and Subsurface Sewage Disposal System Upgrade, <br />Prepared for Kelly Spinard, 3 Bluff Avenue, New Scabury, Mashpee, Mass. By <br />BSS Design Engineering & Surveying, Scale: I" = 20', Date: Oct. 26, 2016, Drawn <br />by: EJP, MRT, Checked: JER, Job Number: 15198, Title: Site Plan 1 of 2, Drawing <br />Number: P23-98. <br />3. Existing First Floor Plan — Spinard Residence, 3 Bluff Avenue, Mashpee, Mass. <br />Job No: 1605, Date: 29 February 2016, Scale: As noted Scale: 3116" = 1' — 0", <br />Drawn by: MM, Sheet 1 of 2 EX -1, EX -2 Existing Exterior Elevations. <br />4. Floor Plan --- Additions & Alterations to the Spinard Residence, 3 Bluff Ave, <br />Mashpee, Mass., By: Archi-Tech Associates, 6 School St., Cotuit, MA, Job No: <br />1605, Date: 01 November 2016, Scale: As noted — 114" = F-0", Drawn by: MM, <br />Sheet 1 of 2 —A1 & A2 —Exterior Elevations. <br />0 <br />