My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/14/2016 SEWER COMMISSION Minutes
>
4/14/2016 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2018 10:54:29 AM
Creation date
1/5/2018 11:23:15 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
04/14/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GHD new contract progress to date: <br />• A kickoff meeting has been held with a representative of Mashpee Commons ( April 5, 2016) <br />• A Kickoff meeting is currently being scheduled with members of the Wampanoag Tribe (April 27, <br />2016) <br />• Data collection and analysis has been initiated: <br />a. Priority Requests: <br />• Collection system drawings — Mashpee Commons. (Priority Item) <br />• GWDP for Mashpee Commons (new with MBR). (Received) <br />• Confirm that the Wampanoag Permit has not changed (we have the 2011 Permit which <br />expires in July 2016). (Received updated Permit) <br />• WWTF Drawing — both facilities. (Received Wampanoag, Need Mashpee Commons) <br />• Operational data for last five years for both facilities (presume Mashpee Commons has <br />data, but Wampanoag has none). Need to confirm Mashpee Commons date of startup of <br />new MBR. (Received Mashpee Commons operational data, need startup date of MBR — <br />determined that effluent data would only be for since WWTF was updated) <br />• O&M manuals for both facilities. (have requested) <br />b. Additional Requests: <br />• Copies of the hydrogeological reports (for the groundwater discharge facilities) <br />developed for both facilities. (requested) <br />• Operations cost data for last five years including chemicals, sludge disposal, operations, <br />maintenance, repair, and other annual costs associated with operation of their <br />wastewater treatment and collection systems and whether they have a contract operator. <br />(requested) <br />• One year of electric bills for both WWTF (requested) <br />• One year of fuel bills (gas, diesel, natural gas, propane). (requested) <br />• Number of users for both facilities. (requested) <br />• Revised Planning Document for Mashpee Commons. (requested) <br />• Planning Document for Wampanoag Facility. (will discuss at kickoff meeting) <br />• Copy of sludge disposal contract or name of sludge hauler for both facilities if <br />available.(MC sludge is handled through contract operations, Wampanoag is not in <br />operation) <br />• Past reports evaluating their systems or facilities. (TBD) <br />
The URL can be used to link to this page
Your browser does not support the video tag.