Laserfiche WebLink
71 Echo Road (continued <br />Committee comments continued <br />Glen Harrington, Board of Health <br />• Any painting/lacquering/priming done? Response "no", it's a bare wood operation. <br />• Do floor drains go to contractor's bays also? Yes, Applicant said they will submit Plumbing <br />drawings. They said they do show on Site Plan. <br />+ Glen said provide bathroom in each bay if doing individual contractors. Provide rough <br />plumbing bathrooms for each leased space. Mike Mendoza noted to make sure to meet <br />Plumbing code and make sure contractor's bays have proper number of units. <br />• Contractor's bays need to go to Board of Health to make sure septic system meets <br />requirements. <br />Mike Mendoza, ,Building <br />• Contractor bays to be a separate operation? Response: "yes", and they will be asking for <br />relief. Don't know who will lease. Mike advised that once they have tenant they have to come <br />in for approval. <br />• If thinking about signage, Mike suggested they plan for it now. He advised that street number <br />needs to be on sign. <br />• Mike said there is a possibility project could fall under controlled construction of the Building <br />code. <br />• Lot is not part of pre -contact or post -contact archeological sensitivity area. <br />Mike Mendoza pointed out that probably the biggest concern down the road is the contractor's bays. <br />He said be aware Applicant may have to go back to ZBA. Also, Fire Department does have concern <br />about the dust issue. Applicant said they will provide system details to Mike (Building) and to Fire <br />Department. <br />Applicant asked whether they could get approval prior to getting a tenant? Mike said he and ZBA <br />Chairman Jonathan Furbush would have to review the matter. <br />Conclusion <br />MOTION: Glen Harrington motioned to approve with the conditions that: <br />• The Fire Department has Knox box for the gates. <br />• Recycling container for cardboard be provided. <br />• The fire hydrant be moved with Water Department's assistance. <br />+ Revised Plans be provided to ZBA. <br />• Request variance for loading dock drainage. <br />Joyce Mason seconded this motion; and it was unanimously passed by Plan Review and by Design <br />Review. <br />3 <br />