Laserfiche WebLink
8 <br />Community Preservation Committee <br />Minutes <br />December 8, 2015 <br />APPOINTMENTS & HEARINGS: <br />Review of CPA Projects Pro o ed for the May 2016 Special Town Meeting: <br />Andrew McManus, Conservation_ Agent: (continued) <br />Mashpee Greenway — Quashnet River Path and Footbridge: <br />With regards to the planned bridge, it was noted that Charles Rowley provided cost <br />estimates for the Quashnet River Bridge at two different site locations. Preliminary costs <br />in the amount of $15,000 include engineering to survey the proposed site locations, to <br />conduct soil investigations, design, and specifications in addition to permit filing. <br />Mr. Rowley has recommended that a pre-engineered fiberglass bridge structure with a <br />span of 25' and width of 4' be constructed. The estimated cost of the bridge materials is <br />$15,800. With the mobilization, site preparation and construction of other portions of the <br />project, the cost may approach $50,000. The total construction cost is therefore <br />considered at $65,800. <br />The $84,800 project includes $2,000 in construction oversight and $2,000 for trail <br />construction. Grant funding if obtained would provide matching support. It was noted <br />that any unused funding would be returned to the Community Preservation Committee. <br />Motion made by Mr. Larkin to close the hearing. <br />Motion seconded by Mrs. Sherman;. <br />VOTE: Unanimous. 9-0. <br />Roll Call Vote: <br />Mr. Halpern, yes Mr. Kaplan, yes Mrs. Buschenfeldt, yes <br />Mr. Larkin, yes Mr. Lord, yes Ms. Rommelmeyer, yes <br />Ms. Waygan, yes Mrs. Sherman, yes Mr. Shaw, yes <br />