My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/16/2015 SEWER COMMISSION Minutes
>
4/16/2015 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2018 5:06:20 PM
Creation date
1/11/2018 2:38:50 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
04/16/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Town of Mashpee <br /> vx <br /> 16 Great Neck Road North <br /> Mashpee, Massachusetts 02649 <br /> BOARD OF SEWER COMMISSIONERS <br /> Mashpee Town Half- Waquoit Meeting Room 1 <br /> Thursday, April 16, 2015 — 7:00 PM <br /> Board Members Present: Also Present: <br /> Tom Fudala, Chairman Jeff Gregg GHD <br /> Joe Lyons, Vice Chairman Paul Gobell, Sewer Commission Administrator <br /> Mark Gurnee, Clerk <br /> Glenn Santos <br /> Tom Burns <br /> CALL TO ORDER <br /> Chairman Tom Fudala called the meeting to order at 7:00 PM. <br /> REVIEW OF MINUTES — 3119115 Meeting <br /> Joe Lyons made a motion that the minutes from the March 19, 2015 meeting be approved as <br /> presented. Tom Burns seconded the motion. Roll Call Vote: Tom Burns, yes; Joe Lyons, yes; <br /> Tom Fudala, yes; Mark Gurnee, abstained; Glenn Santos, abstained. The motion was approved by <br /> a vote of(3-0-2). <br /> STATUS OF DRAFT FINAL PLAN —Jeff Gregg <br /> Jeff Gregg reported that he had gone through all the comments received from the last draft plan, <br /> and had updated the current draft with requested changes, with the exception of Rick York's <br /> comments that he had received just today. The only new change is the addition to Chapter 2 of a <br /> summarization of the CCC 208 plan. <br /> Jeff Gregg stated that many of the comments received dealt with monitoring of the plan and TMDL <br /> compliance. Jeff stated that compliance is dependent on the performance of the shellfish; if the <br /> shellfish do well, the compliance plan will be ahead of schedule before 25 years. <br /> Jeff Gregg stated that he has set up a table that deals with shellfish; if there is "x" metric tons of <br /> shellfish removed, then half of the weight of that removal is nitrogen. After 5 years, 50% of the <br /> amount of the shellfish removed is nitrogen. Jeff Gregg has made changes to the tables in Chapter <br /> 9.2 and 9.3. The intent of the tables is to reflect where we are at the end of Phase 1: who is doing <br /> what, and how much is being projected. Jeff stated that what he would like to be able to do is <br /> indicate that these tables can be adjusted based on whatever those final agreed-upon values are in <br /> the communities that have to deal with it. Tom Fudala stated that the tables should reflect our final <br /> plan, and these tables do not do that. Jeff Gregg reminded the Committee that these are planning <br /> numbers and he is trying to make the plan regionally cooperative among the towns of Barnstable, <br /> Falmouth and Sandwich. Jeff stated that he would need to add a text reminder of the phasing <br /> based on matrix prioritization. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.