Laserfiche WebLink
Capital Improvement Program Committee <br /> Minutes <br /> December 13, 2005 <br /> School: (continued) <br /> System wide Security__Phase II - $60,000: <br /> Phase II would allow for digital surveillance and access control at all three <br /> schools. A card swipe door system would be installed to control and <br /> monitor access to the school buildings. Surveillance systems would <br /> provide 24 hour digitally recorded monitoring of the inside perimeters of <br /> all of the schools. <br /> The proposal was recommended for use at all Town buildings. It was <br /> noted the Police Department also has the card snipe/surveillance proposal <br /> in their FY07 budget request. <br /> I .C. Coombs Bathrooms- $40,000...-. <br /> Additional bathrooms for students and staff'were contained in the FY06 <br /> school budget request. In-house support has reduced the estimate by <br /> $101,000. Presently there are 86 adults in the building utilizing two <br /> restroom facilities. Two staff members are male, the remainder female. <br /> Guidelines stipulate there shall be separate toilet facilities for male and <br /> female employees. <br /> S Air Conditionir - $25,000: <br /> The referenced sum would allow for the department to conduct a <br /> feasibility study and engineering plans for upgrading the air conditioning <br /> to include all of the classrooms contained in the high school. It was noted <br /> the windows ill the building are too small to bring i fresh air to have any <br /> effect on room temperature. This type of environment is deemed <br /> unsuitable for learning. <br /> School: - It was agreed that all building issues will be forwarded to the <br /> Planning and Construction Committee for input and review. The School <br /> Department was requested to list their project priorities after Technology <br /> Infrastructure Phase 11 & III, and the K.C. Coombs & Quashnet School <br /> Flooring projects. <br />