My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/19/2006 CAPITAL IMPROVEMENT PROGRAM Minutes
>
12/19/2006 CAPITAL IMPROVEMENT PROGRAM Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2018 5:05:24 PM
Creation date
1/19/2018 12:59:35 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CAPITAL IMPROVEMENT PROGRAM
Meeting Document Type
Minutes
Meeting Date
12/19/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3 <br /> Capital-Improvement Program Committee <br /> Minutes <br /> December 19, 2006 <br /> Building & Grounds(Planning & Construction <br /> Catherine Laurent, Assistant Director of the Department of Public Works <br /> was present to recommend building and grounds projects for fiscal year <br /> 2008. 1t was noted, the Planning & Construction Committee has not <br /> prioritized their project requests to the CIP Committee to date. <br /> The installation of a new shingle roof at the Town Hall ll building was <br /> prioritized as the roof-boards are-deteriorating and shingles are becoming <br /> loose. The plywood and existing shingles would be removed and <br /> replaced. The project request is $40,000. <br /> An additional priority is the installation of a new rubber membrane on the <br /> lower section of the Ton Hall facility. The flat roof, installed nth the <br /> renovation in 1996 has leafed for a number of years. The membrane was <br /> sealed last year as a temporary measure. The budget estimate of$30.,000 <br /> includes the rubber membrane, re-flashing of the parapet and <br /> improvements to the roof s drainage system. <br /> The need for carpeting was reviewed and prioritized. A budget estimate <br /> of$55,000 would replace all of the carpeting in the Town Hall building. <br /> The existing carpet was installed in 1996. There is visible wear in a <br /> number of locations,the worst being the front foyer location. <br /> Discussion followed with regards to phasing the carpet replacement. Ms. <br /> Laurent was requested to break-don the carpet cost analysis for <br /> additional consideration. In the area of safety, the replacement of the <br /> carpet in the front foyer was prioritized. <br /> Additional capital improvement project requests include parking lot <br /> improvements to the DPW facility. This has been ars ongoing request of <br /> the Department of Public Works. The existing parking lot is severely <br /> cracked and has settled in a number of areas since it was resurfaced in <br /> 1986. The DPW shares the space with the Harbormaster and Shellfish <br /> Warden. <br /> J <br />
The URL can be used to link to this page
Your browser does not support the video tag.