My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/5/2012 CAPITAL IMPROVEMENT PROGRAM Minutes
>
1/5/2012 CAPITAL IMPROVEMENT PROGRAM Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2018 5:02:55 PM
Creation date
1/19/2018 1:56:28 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CAPITAL IMPROVEMENT PROGRAM
Meeting Document Type
Minutes
Meeting Date
01/05/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7 <br /> Capital Improvement Program Committee <br /> Minutes <br /> ', 2G12- <br /> Pignning&Construction: (continued) <br /> The installation of a Rew.sMtic Vstem at Town Hall has been Mn the capita <br /> program for a number of years. The $300,000 project includes the design and <br /> installation of a new system with connection to the WVVTF presently under <br /> construction on Meetinghouse Road. The replacement is proposed to coincide <br /> with the re-construction of great beck Road forth and the re-alignment of the <br /> intersection of Meetinghouse Road, and the anticipation the Town would connect <br /> to the waste water treatment facility on Meetinghouse tinghouse Road. It is hopeful that. <br /> funding from the Tribal project would offset costs associated to the project <br /> proposal* <br /> It was noted that a new o .-site septic system installed at the Town Mall Facility <br /> would cost about the-same. It is also estimated the$300,000 project would take. <br /> the sever line to the Tribal WWTT. <br /> Construction of a wastewater treatment facility for the Tribal housing complex is <br /> anticipated to be completed next month. The Town Manager is expected to meet <br /> with the Tribe to refer their plans in a+ dit on to wastewater capacity needs to <br /> meet load r quirements. . <br /> gree-year project is proposed to mpgode electrical se�iee and outlets in 46 <br /> classrooms at the Qjmhnet.School, a cost $.25,000 pr year. The building i <br /> noir 30 years old, and the electrical services and outlets are outdated. There is a <br /> n ed to modernize theuildmng for safety poses. <br />
The URL can be used to link to this page
Your browser does not support the video tag.