My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/4/2011 COMMUNITY PRESERVATION ACT COMMITTEE Minutes
>
1/4/2011 COMMUNITY PRESERVATION ACT COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2018 5:02:53 PM
Creation date
1/24/2018 1:49:10 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
COMMUNITY PRESERVATION ACT COMMITTEE
Meeting Document Type
Minutes
Meeting Date
01/04/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
lashp a Capital Needs Assessment <br /> Archives <br /> Square Footage: .2,000 - <br /> Building Age: 1965 <br /> Date: December 3, 2010 <br /> Iters Trade i r�emendations f em rks Unit ty C <br /> stPriorit <br /> Cost <br /> 1 ARCH Provide ISP accessible walk and entry to Front door. $121000 1 <br /> P ��M--M��� MMMM M <br /> 2 ARCH Provide new HP accessible hardware to entry door. - - -- $500 1 <br /> 3 AITCH rade toilet facilities I;meet ADA requirements. ��..._ �$35F000 1. <br /> 4 ARCH Provide c.hairlift or elevator to access lower level. - - - $1 rD 0 1 <br /> ARCH Provide accessible signage all doors. $50 1 $750 1 <br /> ARCH Provide required HP accessible clearances at lower level stair <br /> landing. $2t000 I <br /> Arch The existing roof leaders at the front of the building lead to ars <br /> underground drainage relief system which most likely consists of a <br /> drawln pipe down at the footing. We would recommend the roof <br /> leaders be directed away from the building foundation and to a <br /> drywell. LS $3k00 2 <br /> AITCH The interior of the basement galls should be treated with an <br /> lintenor waterproofing such as an lonite material. LS $13500 <br /> 9 ARCH Depending on what is found when the basement is cleared t <br /> perform the foundation waterproofing, mold remediation may be <br /> required. $5,000 1 <br /> 10 ARCH Provide HC hardware on all doors. $500 1 <br /> 11 AITCH Provide new stairs and railing to meet MA code. $103000 1 <br /> 1 ENV lRemove tine moss accumulation on the shingled roof. The existing <br /> roof shingle is expected to provide another -10 years of service. <br /> $500 <br /> 2 ENV The gable trim should be repaired and refinished and the louver <br /> vents replaced. $39500 3 <br /> 3 ENV The windows should be replaced with more energy efficient units. <br /> $600 9 $5,400 3 <br /> 4 ENV A slued dormer roof should be installed over the rear basement <br /> egress bulkhead. Currently the bulkhead fills with water during rain <br /> events and makes its way into the basement. <br /> $10 r 000 2 <br /> _ENV jPressure wash and seal the exltin woad shingles. <br /> $2,0001 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.