My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/4/2011 COMMUNITY PRESERVATION ACT COMMITTEE Minutes
>
1/4/2011 COMMUNITY PRESERVATION ACT COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2018 5:02:53 PM
Creation date
1/24/2018 1:49:10 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
COMMUNITY PRESERVATION ACT COMMITTEE
Meeting Document Type
Minutes
Meeting Date
01/04/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
•�� <br /> 1 MECH The existing boiler should be replaced within the next 5 years with Provides improved <br /> high efficiency gas-fired condensing boiler for improved energy energy savings. <br /> savings. Debates available $52000 1 $5,000 3 <br /> 2 IIEFI Exhaust air fan and ductwork system should be provided for first <br /> floor and basement toilet rooms. $12000 2 $22000 1 <br /> 3 MECH The basement ductless AC indoor unit should be tested and <br /> repa rlre laced as required. $1,000 1 $12000 2 <br /> I IE H Ventilation air system should be installed in the basement Provides unproved <br /> w/additional air con.ditioning and make-up ventilation to provide energy savings. <br /> improved humiditycontrol. Debates available $72500 1 $71500 4 <br /> 5 I IE H The outdoor refrigerant piping insulation for botsystems <br /> should be replaced. Outdoor condenser units should be installed <br /> on pads. $500 2. $11000 <br /> 1 ELEC Electrical distribution system: The existing service should be <br /> upgraded.All original service equipment and panels should b <br /> replaced. $5,000 1 $53000 2 <br /> ELEC Interior Lighting: Most of existing fixtures are not the most energy Providet Improved <br /> efficient and should be replaced with new. energy gavings, $82000 1 $8,000 <br /> ELEC Emergency Lighting: existing self contained battery units should be <br /> replaced. $22000 1 $2,000 2 <br /> ELEC Site Lighting: Existing site lighting fixture are original and not Provides Improved <br /> energy efficient. New exterior lighting should be provided energy savings <br /> throughout the site. $32000 1 $3,000 <br /> 5 ELEC Branch Circuit:Additional receptacles should be provided to <br /> accommodate the resent needs of the space. 20 1 2, o4 <br /> ELEC Fire Alarm:A dedicated fire alarm system should be provided Code requirement <br /> adequately cover the entire building. Additional device #will be <br /> required to erovide fall coverage. $101000 1 $10,000 1 <br /> 1 PLUM Fixtures: Install-low flow, water conserving water closet. Provides improved <br /> energy savings $2:500 1 $2500 <br /> 2 PLUM fixtures: Install low flow metering lavatory and faucet. Provides improved <br /> energy avin s $11500 1 $11500 <br /> PLUM Vater system: Insulate the existing domestic hot and cold water Provides Improved <br /> stem i in . ever -savings $2,000 1 $2,000 <br /> PLUM Vater system: Install a thermostatic,nixing valve on the domestic <br /> $1 <br /> hot waters stem. 1350 1 ,500 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.