My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/04/1993 CONSERVATION COMMISSION Minutes
>
03/04/1993 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2018 5:08:19 PM
Creation date
1/24/2018 2:49:31 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
03/04/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br /> Conservation Commission <br /> March 4. 1993 <br /> Page 30 <br /> It was noted spacing in the planking of the floats must allow light penetration and <br /> the Chairman asked that they be reduced to 20 .f. or less, together with proof <br /> that it was existing. <br /> Mr. DiGregorio stated they will come 3n with a revised plan dealing with float <br /> configurations at 200 s.f. with 4 inch deck spacing. He asked if the date being <br /> discussed would be after compliance with the enforcement order's <br /> Mr. Homeyer stated that was correct and suggested if he does not comply with removal <br /> of the steps by April 29, the date for the continued hearing, the Commission should <br /> start imposing a fine of $300 per day from that date forward. <br /> . DiGregorio asked if this is a policy of the Commission regarding existing floats <br /> and the 200 s.f. 11Hdtation <br /> Mr. Sherman suggested taking it under advisement until they provide doc Mentation as <br /> to the antiquity of the dock but make it clear right noir, even if he does, the Comm-- <br /> ission is under no obligation to let him keep it. <br /> Mrs. Simmons stated- i f he can provide proof, the i s i may ay consider allowing <br /> to keep the extra footage. <br /> 10 DAVID C. W= to relocate a 6' x 10' seasonal float and a .am <br /> add six 1 "' diameter <br /> wooden piles. and two " batter piles as supports for an existing fixed pier, seasonal <br /> ramp and three floats at 8 Curt Way. Mario DiGregorio and Roger Mc Tevish presenting. <br /> Abutter notificati <br />
The URL can be used to link to this page
Your browser does not support the video tag.