Laserfiche WebLink
Conservation Co fission <br /> March 12, 1992 <br /> Page 10. <br /> Enforcement - continued: <br /> New eabury -- Bliaff: On-,site was held three weeks ago. There has been no response <br /> to the Enforcement order or the on-site. The agent will check the status and send a <br /> letter. <br /> Karlotis: Dock with electrical, service and bubbler system, Susan St. Pierre wants <br /> to do this as an Amended Order, <br /> Mr. Sherman advised beneath the dock is a retaining wall five Feet high. A Notice <br /> of Intent is required, <br /> Motion made and seconded that a Notice of Intent be filed by Andrew Ka. iotis. <br /> susana Lannik abstained. <br /> iprin : Work has been done on the Popponesset Bridge. When asked, Mr. Viprino <br /> admitted he did it. He stated 'some guy told him to do lt, but he does not know <br /> his name' . <br /> A transcript on the meeting was distributed for review. The consensus was to see <br /> what can be done to ban him from any work in Mashpee. <br /> Mr. Homeyer advised theWater-ways Commission is upset with George Viprino. The <br /> reason he did it was Iso that he could move his equipment across the bridge. They <br /> felt Mr. Sherman is not approaching this w1th vigor. <br /> Mrs. Stmons stated if Waterways has a gripe with the Commisslon, they should <br /> come and talk with us. <br /> Mr. Homeyer asked that the Waterways Commission be sent a copy of what has been <br /> done here tonight; that is what they are asking for. <br /> Mr. Sherman. stated he is offended and shall made it known to Ben Gordon. He <br /> advised Mr. Viprino can be fined $300 per day for every day he does not file the <br /> required Notice of Intent. The Enforcement Order to be issued will require hen <br /> o file aNotice of Intent within one month and include an as built plan stamped <br /> by an engineer. <br /> I <br /> Motion made and seconded that an Enforcement Order be issued to George <br /> viprino requiring him to file a Notice of Intent within one month and <br /> that he provide an as-built plan stamped by a Registered Land Surveyor <br /> and Professional Engineer. Unanimous Vote. <br /> Biknaitis: Pre-trial-conference scheduled on March 25. A letter was received <br /> from the Assistant District Attorney stating the Agent does not need to be present. <br /> Ms Lanni stated Mr. Sherman has a night to be there legally and recon ended he be <br />� y <br /> there with the evidence. <br /> Letter to be seat statulgMr. Sherman will be present with the evidence but if it <br /> is needed now, it will be provided. <br /> anedy: Additions filed for lasty ear. The Board of Health want-ed the well first. <br /> Letter to be sent that he must add the well to the filing which is unresolved. He <br /> will have to pint in hay bales. <br /> Lotion made and seconded to approve the minutes of 11/21/91, 12/5/91, 12/18/91 <br /> 1/9/92, 1/16/92 1/23/92, 1/30/92 as written. <br />