Laserfiche WebLink
X <br /> ConservationCommission <br /> March 12, 1992 <br /> Page 5. <br /> It was noted the Attestation form and Access permission form were not included <br /> in the filing. <br /> Mr. Homeyer advised the waterways. Commission was concerned with the passage of <br /> boats; width could be a problem especially with the wind, <br /> Mr. Costa was asked how many notices were sent to 1butters and he stated four. <br /> Vere was no abutters list In the filing package, <br /> Vim: Motion made and seconded to close upon receipt of shellfish comments, <br /> additional fees and requested fo g. it will. be included in the order <br /> of Conditions that maintenance will be clone only with prior notification <br /> to the o rm-Lision n the dock, walks and stone revetment. <br /> D BE CU)SED UPON RECEIPT. <br /> 8:45 CONTINENIAL CABIEVISION, 51 Redwood Circle. The Agent gage the background <br /> on this filing. There was erosion on the hillside. <br /> Mr. Homeyer advised Ernie Virgilio was concerned about the erosion and what it <br /> will do to the herring ron. He does not feel he could entertain a continuance. <br /> Mr.. Sherman advised he warts to keep it open so that he may go back to -see if <br /> there. is more erosion. <br /> Mr. Homeyer removed his opposition to the continuance. <br /> It was noted DEP is considering issuing an Administrative Penalty of $5,000. <br /> NOTE: lotion rade and seconded to continue to April 23, 1992 at 9:45 p.m. <br /> CONTINUED To APRIL 23, 1992 - 9:45 p.m. <br /> 9:00 NORMM J. BELLXVEAU for the construction of a dwelling, sewage disposal; <br /> and a four foot wide staircase on the- bank to Ashumet Pond at 41 Lakeview Drive. <br /> Abutter receipts were presented by Bob Raymond. A letter was read into the <br /> record from Prime Properties re the installation of ,sewage disposal in favor <br /> of the project. The plan was reviewed. <br /> It is a Four bedroom dwelling with septic, driveway, two decks, all cross- <br /> hatched on the plan. Fieldstone walls are proposed. The Zoning Board of <br /> Appeals granted the variance to 25 feet off the street line. <br /> Mrs. Simmons pointed out the stone retaining wall is going to be over the edge of <br /> the bark and the house may be-on the edge bf the bank. <br /> Mr. Raymond stated the wall is for safety reasons so anyone exiting the basement <br /> will not fall over the edge. It will be three feet high. <br /> Mr. Homeyer asked ghat would keep it from sliding? Mr. Raymond stated they will <br /> grout between thestones to hold it together. Roof runoff will be channelled into <br /> dr~ywells. He can move them away from the top of the bank if necessary. <br /> . Sherman stated more construction details are necessary. <br /> Mrs. Sons suggested the house be made grower and brought back. Mr. Raymond <br /> stated his client had particular reasons for choosing this style of house. He i <br /> limited to one floor and it is tight in theme with the septic system. <br />