Laserfiche WebLink
Conservation Commission <br /> February 21, 1991 <br /> Page 2. <br /> Jack Landers Cawley speaking: From my perspective, as a civil engineer, the <br /> standing water, as I understand vernal.. pools, does not sit a month, does not <br /> sit two weeks, it may sit somewhere between 2 - 5 days, perhaps a week; no <br /> more than that. <br /> HOMEYFR: You are addressing vernal pools but Isolated Land Subject to Flooding <br /> has a greater area, as far as the wetland bylaw is concerned. <br /> i• I looked at it as Isolated Land Subject to Flooding which requires a <br /> 100 year storm event be examined, 7 inch rainfall event, and it allows a I o t <br /> of these other variables, slope, depressions, type of soils, type of cover, <br /> and in addition allows us to take over a 24 hour duration, percolation. A <br /> 10year, 7 i <br />