Laserfiche WebLink
Conservation Commission <br /> May 1 , 1991 <br /> Page 4. <br /> Ms Behrman stated rehabilitation of the cranberry bogs down there would be very <br /> difficult. Mr. Butler agreed and when the Trustees walked through, they also <br /> agreed. He requested the commission contact his office before June 5 if they <br /> have any comments. <br /> 7:30 PA .ICK SIGHT, 27 Sandollar Inane, Continued from April 4, 1991. <br /> There was no one present for this hearing which had been continued several <br /> times. After discussion, <br /> M: Lotion made and seconded to deny without prejudice for lack of information <br /> the application of Patrick Enright. Unanimous vote. <br /> 7:45 . BACON, 56 Waterway, Continued from March 23, 1991, <br /> A letter regarding light use of fertilizers was reviewed. A.new plan with plant <br /> list was received. Work will be done by Mr. Bacon. The lawn is flat with a two <br /> foo t bank. t o Mean -High Wa ter. The only is sue remaining---from the las t hearing wa s <br /> correct advertisement of address and abutter notification receipts which were <br /> provided. <br /> There were no public comments. <br /> VOTE: Lotion made and seconded to find a negative determination to Lawrence B. <br /> Bacon. Unanimous Vo to, <br /> 'NEGA'TIW ION, <br /> oo CHARLES NIRENBERG., 28 'triton Way, continued from April 18, 1991. Nancy Dupe <br /> presenting. Design is for low watering needs plantings to protect the coastal. bank. <br /> Ids Behrman pointed out the bank would not need protecting if several of the orders <br /> of conditions had been followed and asked what is the situation of the drainage <br /> pipe., Ms DeKimpe stated the superseding order has received a certificate of <br /> compliance, <br /> The commission was advised .they would like- pennission to -replant the annuals, as <br /> needed. <br /> Mr. Sherman had no problem with the plan. <br /> There were no public comments. <br /> VOU: Motion made and seconded to close the hearing, <br /> 8:15 DAVID NOLFF, �s� an after-the-fact filing for an enlargement to existing <br /> g <br /> fixed timberier, ram and float under B 4 -507• placement of three t <br /> � � � p amber <br /> piles; and maintenance of existing brie walk and timber steps at 12 Crosstree Way. <br /> Atty. Albert Schulze represented Nebulous Realty Trust. Abutter's receipts were. <br /> presented, They are seeking ars order of Conditions for the enlargement of the <br /> existing pier. Three timber piles have been placed with a floating structure and <br /> there is an elevated stairway leading from a brie walk to the beginning of the <br /> pier, The clock has been pushed out because at low tide there is absolutely no <br /> water, maybe 6 inches. <br /> The original filing was reviewed. <br />