Laserfiche WebLink
Conservation Commission <br /> July 2 , 1990 <br /> Page 8. <br /> Joh cARjI - SE 43-744: A Certificate of Compliance was requested (Letter <br /> from Moines & McGrath was read). There is a 5 ft. timber walkway across lots <br /> 520 and 521. The pool deck is 6 ft. wide on the south side rather than the <br /> t, shown on the plan, A fenced-in arca containing pool equipment is not on <br /> the approved plan. <br /> It was agreed, at the very least, -an amended ,order is necessary. <br /> Mr. Sherman suggested he contact Todd Palmatier for an n-site and report back <br /> to the Commission. <br /> ,TAT SUILIVAN - ROOD CIRC: A letter from Charles Rowley was read citing lack <br /> f good loam and seed on the outside of the roadway which should also be protected <br /> by mulch. There is no evidence of the leaching basins having frames and grades. <br /> Fill was placed against a Beed tree. <br /> Mr. Coffey advised there is a dead oak from previous road construction. <br /> Mrs. Simmons suggested Town Counsel should be brought up to date on this. <br /> Mr. Coffey stated, regarding the money to be donated by Mr. Sullivan, it should <br /> not be. -accepted With any strings attached. <br /> M&SS. A UBON A letter was read re town owned land and the 1972 conservation <br /> restriction for the Alper property on Johns Pond. They are inspecting all such <br /> properties; the Commission is invited to go along. <br /> Dom" REALTY TRS: The pool was denied. Their request for a superseding order <br /> triggered an SNF and -NEPA filing. EOEA comments are due. The reasons for denial <br /> will be reiterated. <br /> APPOINTMENTS:: The agend advised there are 25 unresolved enforcement proceedings <br /> to be followed up on. Be asked the co i. sion's permission not to schedule any <br /> appointments for the upcoming week. to allow hire to resolve these 'issues. <br /> vun: Motion made and seconded to endorse the suggestion of the agent to not <br /> schedule appointments in order to catch up on enforcement issues. <br /> POPPONE&M -- SH An on-site was held with the Agent, Michael <br /> Grotzke and .Jim O'Connell of Cal who suggested test borings for further delin- <br /> eation at the last -two cottages, <br /> Mr. Grotzke advised he did the borings manually and gave an overview to the <br /> Commission, This will be provided in writing to the Cornr�ni <br /> ms ion and C M. This <br /> confirmed Mr. 'Connell's suspected limits of coastal. bank. A plan was provided. <br /> Mr. Shermran 'ased, based upon what was found, revisions were made; are they all <br /> in the hands of the Coisi.on now' <br /> Mr. Grotzke advised they are filing the revisions concurrently to the Board of <br /> Health. The change will insure the concrete wall is outside the coastal dune, <br /> the coastal bank is stable, If Jim o'Connell concurs, they will provide a <br /> revi <br />