Laserfiche WebLink
CONSERVATION COMMISSION <br /> Heeting of April 19 , 1990 <br /> Commissioners present: V. Louise Behrmanr Patrick Coffey, <br /> Joseph Burns , Duncan York, Harry Desroslers, Richard Halpern. <br /> The meeting was called to order at 7 % 00 p . m. <br /> 7 : 30 WILLIAH T . A PL YAP , for the proposed raising of ars <br /> existing house to conform with flood plain regulations and <br /> construction and maintenance of an addition, relocation of an <br /> existing shed, new sewage disposal system and revegetation a <br /> 57 Kim Path . Bob Burgann presented abutter notification <br /> receipts . An addition to the rear of the house is proposed, <br /> second floor also . The first floor elevation is below the <br /> 100 year flood elevation so it is to be raised to flood plain <br /> requirements ; a new septic system is necessary. options are <br /> limited , Mr. Appleyard has town grater but his neighbors are <br /> using their wells . A variance granted by Hoard of Health has <br /> been upheld by D. L . P . It will be necessary to regrade, area <br /> regraded will go to the property of the abutter who has given <br /> permission . Areas regraded will be revegetated with dune <br /> grass . To comply with Title V. there are concrete galls to <br /> be buried below grade to keep the liquid within the confines <br /> of the leaching areas . This has been approved by Board of <br /> Health. There is an existing drywell dealing with runoff. <br /> With regard to the dune and beach, they propose to install a <br /> wall on the edge of the dune . Hr. Sherman added, slightly <br /> into the dune . <br /> The walls will g'o down so that there is- a minimum of four <br /> feet below th'e grade on the bac} side of the house , below <br /> existing grade about three feet. They will be buried below <br /> when the regrading is done and will not be seen. They will <br /> be adding four feet of fill at the gall tapering to existing <br /> grade on the abutting property. <br /> Hr. Sherman asked if the material to be added will be <br /> compatible with the existing dune . Mr. Burgs ann stated they <br /> will match it with what ' s there now. <br /> Hr. Sherman stated, from the standpoint of the Zetland <br /> Protection Act, it meets performance standards . The <br /> dimensions for the leaching facility were not done . <br /> Mr. Burgmann stated the cesspool , based on what they found, <br /> is in the groundwater. They are meeting the 100 ft. <br /> requirement of Title V but not the 150 ft. requirement of the- <br /> Board of Health which received a variance . <br /> Mr. Coffey questioned the leaching from the beach and was <br /> told it is 79 feet to the edge . He questioned how the <br /> building will be elevated and about revegetation. <br />