My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/19/1990 CONSERVATION COMMISSION Minutes
>
04/19/1990 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2018 5:17:58 PM
Creation date
1/30/2018 8:15:55 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
04/19/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f <br /> pri1 19, 1990 <br /> Page 3. <br /> to the street going away from their Griew. Concerning their <br /> well, fir. Burgmann stated Mr. Brown was in attendance and was <br /> aware the Board of Health waived the regulation . <br /> Ms Behr an asked for a proposal for the upgrade . Mr. <br /> Burgmann offered to generate figures for a 10 or 25 year <br /> storm to show ghat the rise in the water level would be based <br /> upon the fill being pint in there . <br /> Mr, De rosiers suggested ' they incorporate leaders into <br /> dr rwe l l s to help the situation. Mr. Burgmann agreed this was <br /> legitimate request. <br /> HEARING TO BE CLOSED AFTER RECEIPT of FLOOD FIGURES AND <br /> PROPOSAL FOR UPGRADE OF DRYWELLS AND NOTE ON GUTTERS . <br /> 7 : 45 PAUL MC CLATCH* , fot the proposed boat slip dredging; <br /> change in boat ramps ; construction of bulkheads; deck over <br /> existing pier and electric and water service to piers at 2 <br /> Seconsett Point. John Ja obi presenting. The first area of <br /> work, they want to increase the decking, 2-3 piles, connect a <br /> pier. Also proposed is to construct a bulkhead ,to retain the <br /> earth behind the piles . <br /> Second area of work is in the middle . It shows the existing <br /> ramp made of concrete . They would like to square it off with <br /> a bulkhead and the other side with a bulkhead. Take the <br /> existing material left behind, approximately 30 feet and fill <br /> with gravel . <br /> Ms Berman asked the amount of excavation to be done and was <br /> told they will be going down 4-5 inches and put gravel . <br /> Excavated material will be used for back filling. <br /> Third area consists of two areas of bulkhead and squaring off <br /> between the ramps . The new areas will be ABC ; 3 X 10 tongue <br /> and groove . Mr. Jacobi advised soundings were not done . <br /> There are boats between 14 and 16 feet in there now. <br /> Pictures were shown. Concerning elevations, they are <br /> bringing filled areas to the back of the bulkhead. Any place <br /> where they clear behind the wall will be revegetated with <br /> Spar ina. Ms Behrman questioned their experience with <br /> planting Spartina and was given the name of the person <br /> knowledgeable in this field . Documentation of his <br /> qualifications were requested . <br /> Mr. Sherman advised there was permission under an old order <br /> of Conditions to dredge out the three slips. Since a <br /> concrete ramp was put in and not included in the original <br /> filing, it was included in this filing with dredging and the <br /> bulkhead work . <br /> Paul Somervile pointed out there is a float involved that is <br /> not on the plans . 111. McClatchy stated he has been paying <br />
The URL can be used to link to this page
Your browser does not support the video tag.