Laserfiche WebLink
i <br /> IIIY hi <br /> I - ~ <br /> Conservation commission <br /> May 3, 1990 <br /> Page 3. <br /> Ms Behrman suggested a written description be provided of how they are planning <br /> to do the excavation and M . Zeppenfeld agreed. <br /> Mr, Coffey asked the proposed 9 osed reve etation for the disturbed areas and was told <br /> ; <br /> there will be -an,e tensiv landscaping plan. <br /> As there may a some time ore something else i done on the lots, r . Simmons <br /> suggested hayales and rye grass to stabilize the soil . <br /> Mr, Grotzke stated they will revegetate, as is or better, with trees and shrubs <br /> temporarily, that is no problem. <br /> Concerning the question of what would be done with the asphalt in areas of excav- <br /> ation, <br /> xcav- <br /> ations it would be removed. Mrs. Simmins stated it should be in the Notice, <br /> whereit is going. The commission would also life to know how they plan to con- <br /> tain the soil around the huge holes. <br /> M * Zeppenfeld stated the haybales will have to be worked out for the site as one <br /> project; a large i land. <br /> Mrs. Simmons stated wheire they have a wall may- require them individually, <br /> Ms Behrman stated if there is going to be a gigantic pile of fill , this must be <br /> located. Mr. Zeppenfeld staetd each hole would have. it's own fill site and would <br /> be replaced back into the hole. <br /> Mr. Coffey suggested,, for clarity,, they have an overall map and the individual <br /> lots could be discussed on a total scope. <br /> Mr. Grotzke provided a copy of a key plan. <br /> #1376: A shallow system with flow diffusers. This is on the sound side of the <br /> lot. Ms Behrman added, on top of the edge of the dune. Mr. Zeppenfeld stated <br /> the elevation is 83, finish grade is 11-1/2, Distance from the system to the <br /> top of the bark is 15 feet. A beach easement is at the bottom of the slope. <br /> Ms Behrman suggested pulling the ha bales back so they are not below the edge <br /> of the coastal bank. Mr. Zeppenfeld agreed they should do a ha., ba I e drawing <br /> on the larger scheme and provide the types of vegetation as it groves down the dune. <br /> Ms Behrman asked the access for heavy equipment and was told they will. come in <br /> with a backhoe. She asked if it mechanically can be done from the back side. <br /> She asked for a detailed description on access and where the heavy equipment <br /> isoin t be. <br /> g g <br /> It was noted the contour defined as the coastal bank is between 9 and 10. <br /> Mr. Grotzke stated it is very definitive top of coastal bank, The top of the <br /> bank is flagged. <br /> COMMENTS: .-Phyllis Paskauskas stated this sounds like a disaster waiting to <br /> happen, <br /> Mr. Sherman stated, at the on-site, it was noticed there was a substantial ditch <br /> that was duce from a cottage dowry over the dunes to the beach club. The culprit <br /> ..has been found. In lieu of a fine, Ise suggested at some date in the near future <br /> New Seabury convene construction people, workers, landscape people and super- <br /> visors <br /> uper- <br /> visons in one greeting to allow the Commission to discuss the wetlands act. <br />