My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/17/1990 CONSERVATION COMMISSION Minutes
>
05/17/1990 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2018 5:20:55 PM
Creation date
1/30/2018 8:18:43 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
05/17/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
fASHPEE CONSERVATION COMMISSION <br /> Meeting of May 17 , 1990 <br /> P re s e n t Gertrude W. Simmons, V. Louise Behrman, Patrick Coffey, <br /> Duncan York,, Harry- Deroers, Richard Halpern <br /> 7:00 FRANK J. FEE & JOSEPH MC CURDY, 11 Dean's Hollow Road, Continued from <br /> May. 3, 1990. Chuck Rose presented abutter receipts, A letter from the Board <br /> f Health was read stating Board of Health approval not r qu i t ed. <br /> The Chairman asked for questions or comments. <br /> . <br /> Harold Cloran, an abutter, asked to view the plans. Mr. Rose explained ghat is <br /> proposed and Mr. Cloran had no comments. <br /> Mr. Sherman stated he had no problem with the project, <br /> CLOSED - ORDER OF CONDITIONS IN 21 DAYS. <br /> 7:15 ST AT G D PONDS, EDE TON DEVELOPMENT, Continued from May 3, 1990. <br /> Mr. Sherman advised he met with the person doing the replication, Charlotte <br /> Cogswell , who has put together the whole plan. A handout was distributed) . <br /> The wetland is in a slope which will be tapered up and planted with the bay- <br /> berry and wild cranberry in the wetland itself. He was of the opinion the <br /> Commission could close the. hearing. <br /> Mrs. Simmons stated it should be put in the Order of Conditions how many ,years <br /> for monitoring. <br /> Mr, Coffey stated this should be started for this growing season, He asked from <br /> where the appropriate soils are coming. <br /> 'TO BE CLOSED AND ORDER OF CONDITIONS ISSUED AT THE NEXT MEETING AFTER RECEIPT OF <br /> THE APPROPRIATE INFORMATION. <br /> 7:30 MI IAM BROWER, 12 Summers a Road, Continued from April 5, 1990. John De ugeri os <br /> f Coastline Engineering presented abutter receipts. There is an existing walkway <br /> that crosses the wetlands, access for a temporary dock properly permitted in 1976. <br /> Photos of the existing structure were shown. The float is 8 X 10 (Mr. Puer i o s <br /> initialed this in on the plan) . The proposed work is routine maintenance auth- <br /> orized <br /> uthorized under the Order of Conditions; replacement of the deck and/or stringers. <br /> It does not fall under Chapter 91 becau-se it is removed seasonally. They will <br /> keep traffic to the abutting s pa rt i n a to a minimum. <br /> When asked if any posts will be replaced, Mr, Rugerlos stated they will all stay. <br /> If stained, they will be done before they go on the site. <br /> Mr. Coffey stated he would like to see spacing indicated and was told the enact <br /> same dimensions will apply, 12" spacing on the deck. Clearance under the deck <br /> varies from 36" to 45". <br /> Mrs. Simmons requested 1" spacing on the deck. This was so noted on the plan and <br /> initialed. <br /> Comments :: An abutter spoke in favor of the project. <br /> VOTE: Motion grade and seconded to find for a negative determination. <br /> NEGATIVE DETERMINATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.