Laserfiche WebLink
Conservation Com s ion <br /> November I , 1990 <br /> Wage 8, <br /> Mr. Sherman advised that is the pigeon hole he put it into, he has not asked DLP <br /> for a ruling. He does not see another place for it. Mr. Coffey stated filling <br /> and dumping might be closer. <br /> Mr. Sherman advised Chapter 91 gave an informal opinion that a filing will be <br /> required. Under the bylaw, certification by an engineer is required for any <br /> dock application and asked if they were certifying the structure? <br /> Mr, Thorg advised it is an approximate location; they are not certifying. "There <br /> would be additional details shown of the structure and exact location for the filing <br /> for the permit. <br /> Mr. Raymond of Arrow Engineering stated that is a question with a gray area; it is <br /> mooring rather than a fi <br />