My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/10/1982 CONSERVATION COMMISSION Minutes
>
03/10/1982 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2018 5:14:23 PM
Creation date
1/30/2018 2:24:27 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
03/10/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Con ;-'rvntion commi sio v <br /> jinut s of i; rch 10, 1982 �'�Ge 4 <br /> '•' cr'i g <br /> �3-217 <br /> 8:30 P . :. <br /> l plicant; Bill v�.noe, Cottage 1 , F'laus}pop VillaCej Mashpee <br /> Mr. Michael LeBlanc was present at the hearing to represent Mir. Svanoe, This <br /> Ne in <br /> was a continuance from the February 10, 1982 meeting due to lack f <br /> representations An additional $12 was received from M LeBlanc to cover .he <br /> t e a l advertising and handling fees <br /> Pauline: knead the Public Hearing Notice --- to construct a. four-foot frost wall <br /> and-er an existing building and to construct a ' x 9' bathroom addition at Cottage � <br /> #I , Ma.ushop village, within loo feet off' the top of the bluff along Nantucket Sound, <br /> 1 Explains to L. and that they aro planning t install a f u ��-Foot <br /> Mr. e �an <br /> frost wall underneath an existing Ma.ushop cottage. They will not change the hei ht <br /> of the cottage. Also, they would like to construct a. 10 <br /> ' x ' bathroom addition* <br /> i <br /> The Board establishes the location of the co tta. e. <br /> Ila rch: Asks if he has already sta.rted the excavation? <br /> * LeBlanc: t .t s• tha.t there was a. machine there last October. Mentions that <br /> all they want to do ,is shore-up the building. <br /> Wayne: Asks what is underneath the cottage row, <br /> { <br /> Mr. LeBlanc: It is on concrete blocks dirt* Tlieowner has ha.d a. lot of shift� <br /> to the building and would like to straighten the whole thing out. <br /> • <br /> - ha.rl i e: Asks if this would be in Phase Iv of the M ushop deal. <br /> Mr. LeBlanc: States that he does not know the phase number. <br /> Charlie: Mentions that this would probably be phase III or Iv and that he understood <br /> that the septics were not due to be touched by the Corporation. <br /> Mr. LeBlanc: Mentions that he doesn't believe that, there is any erosion down where <br /> the cot tape 'is. The septic tic is not- going to g t i vol red with the plumbinrD <br /> until it <br /> can get tied in with the new septic. <br /> Way ne: QCs how far-the cottage is from the tola of the bank? <br /> fir. LeBlanc:la.nc# It is about feet, but do not ignote me. Mentions that the wnerk is <br /> ar enough back and is not concerned about _roving the cottage backs <br /> oroth Asks about what is going to happen with the septic in the future? <br /> Charlie: Explains that the agreement that these people have with Nla.ushop is as each <br /> phae of Ha.0 hop is develo-ped, there will be a central septic system put, in and all <br /> ni is ithin that phase will be hooked into those septic systems. The septic sy te�-1 <br /> will be inland, <br /> Dorn thy: Asks if this is poing to be within the Ioo• f et. so that it will require <br /> another film <br /> Charlie: No. it'will be a. minimum of 20 feet for this Particular building, <br /> Pauline: We went down there with ,E and Chris i uebl r and Chris Burden. The a.cy.,rt:13e, <br /> ent__was that all the septics will be beyond the 100 foot mark. <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.