Laserfiche WebLink
a s C n. o r t 3L o COMMI S s or. r F. .` ;•* <br /> +' r <br /> minute*.. .. April. " ": � y_ ;r• pager. 2 <br /> a. <br /> Plan, for'"%%itc b- Lar s ng <br /> i 1 •4z 1.t •r <br /> a .n p plan. entitled:.de Board ambers' reviewedhit.00rbf �xdi <br /> �� nary'r.Pian of sub-Divi n - in Mashpe Owne r/A PP ILlida nt A rno l :• B ��"Cha ce, =+ <br /> Jr,,- Board,-member, Cha �li B ckr� . , asked' that a memo • s ig t -tire_ -.r { <br /> Planning,'Board stating -that is-. contrary. thea Wtirc ',~"- �_'` . <br /> . a►.d f <br /> road drainage-,water directly to surface'- water -- i `this f case.,. the mash-.- <br /> Pee <br /> a --.- <br /> pee River, r., marshes. bordering the., as pee. •River. another� comment was:. :. <br /> that storm drains- should be -led, t ' leaching. pits which. would. retain, the ... ' . Y*• <br /> "Q11 factor. for the road drains and. from, the. ina'l•• leaching pit. fro-_ a. st .=„'-x <br /> crush 'depth-. to -allow the water- n ukrat,l absorbtio�n 'within. the soil as <br /> n� the ,,. <br /> thi9 � is. , c n practice within other. ommunig ties on Cape. lSo”, " tie ,,.1 o,1 ;.. <br /> storm line- should. be indicated on t er plan,,, The -last comment was tha t <br /> lots. 28 , 29 and 3Q could be considered. unbuildable lots by the. i clusion'-, <br /> of wetlands within the lot lines'.' <br /> orders of Conditions #. <br /> Board-. members present. signed Orders of Conditions for . 1,&B. Realty. File..-- . k <br /> sB 3-28 7. manuel Glickman-,e Pile S - and Jean-Pierre Sanchez.',, i let..s .F. <br /> -285, as- t - - hear*1ngswere. held t- the -meeting Qf Apra,1 13:,a nd-. all. were. i <br /> agreement at that time.. <br /> Lot, 7 Frog Pond. ios'e <br /> The Board members previewed letter' datged ' ipril 15. from Arch 'and Jan <br /> Williams asking' for permission to construct. a. wood ` rice approximately .,. . <br /> 19 high along part of their: property locate a`t Lot 7 Frocj Pond Close* _ = <br /> It was noted that 53 feet of the fen�.Nwould run into. the- - 100 footretla " <br /> setback area and the. Board ruled' that a snort notice of intent f orm would <br /> have to beiled. <br /> Iausho Cotte e606/10. 4 <br /> piah was received from Bill Warwick- showing the- loc tion they would' <br /> like to move ,cottage /lo to. Since the Board did not have a quorum,,. <br /> this ratter will be taken up at the meeting of may 11, <br /> amp�0�4 <br /> Determination of South Cape Beach Parkin Lot <br /> t. the Commission#s .last m ting, review was- made on a request for, a `:.'. 4=1P <br /> determination- of applicability under~ the wetlands protection, act for -° J. <br /> a proposed temporary parking area at South Cape Beach A it was voted <br /> that the area described in the request- made by the state was not an. -- <br /> area subject to the Wetland's Act. The proper form was signed at o_-'. r <br /> night'-s meeting, <br /> meeting adjourned at- 10:10 p:m. <br /> RespectRespectf ully submitted, <br /> Marilyn Farren, Secretary <br /> ashpee Conservation commission <br /> M <br />