Laserfiche WebLink
M sh ee conservation Commission 8 <br /> Minutes of October 12* gage <br /> Sp <br /> e ification for B <br /> o <br /> The secretary was asked to type up the specifications for the bogs with <br /> the deletion of aerial spraying. Also, the Board asked that it be ad- <br /> vertised and haat the Board be allowed to review the bids. <br /> Bertram Finley, Lot 241 Waterway. <br /> Mr. Phil Holmes and Mr. & Mrs. Finl6y presented the Commission with the <br /> revised plans as requested showing contours and a method - of draining the <br /> area as well as the garage. <br /> The following order of conditions were written up: to comply with re- <br /> sed plans dated Oct. 12, 1983 - a check valve shall be installed be- <br /> tween the house and the septic tank - the stone, in the leaching trench <br /> shall be washed s tome o - <br /> order of Conditions - 43-304 <br /> MacDonald Land Trust <br /> The Commission issued the following order of conditions <br /> The use of 'the bulldozer t replace the sand and .grade the beach once a <br /> earp referable in the Spring is allowed. Conservation Commission is <br /> to be notified two weeks prior to beginning the work. <br /> y <br /> The <br /> work at Mood Pond shall be limited to basically tree trimming and <br /> removal of dead and dying trees from the water body. No root systems <br /> shall be removed. All work is to be done with hand tools. <br /> Maintenance. of drainage ditch is limited to hand cleaning. Any mechanical <br /> means must be approved by written consent of the Conservation Commission. <br /> The security fence shall be post and split rail type, two rails high. It <br /> shall be placed no nearer than 6 feet- from the high water mark to allow for <br /> the passage of fishermen. <br /> The -maintenance of the raft and "T" pier at John' s Pond 'is approved as <br /> needed. <br /> The use of heaver equipment is limited to the rain beach. <br /> order of Conditions - 43-308 <br /> I aushop V1011age Condominium Trust <br /> cottages # 's 4, 58 8, 7t <br /> The Commission issued the following order of conditions <br /> The top of the slope - should not be cor prom i sed. <br /> The nearly constructed berm shah, be vegetated immediately using similar <br /> material as the existing slope below. <br /> All disturbed areas should be landscaped or vegetated. <br />