Laserfiche WebLink
i <br /> i <br /> I ashpee Conservation commission <br /> minutes of December 14, 1983 pa e 2 <br /> f` 5 <br /> _ 5 <br /> Andrew Carmichael - order of conditions, cont. <br /> Also in the order it was stated that , y bales shall be placed along the <br /> work limit line at the 8 foot contour running entire length f the <br /> ro ect. The septic system shall be in accordance with Title V of the <br /> State Environmental Code and the Town of Mashpee Board of Health Rules <br /> and Regulations* Board of Health variance shall be obtained prior t <br /> beginning- of construction. <br /> Hearing of William Svanoe, Cotta #1, iaush c"t. 1 lla a and <br /> Heari of^ New Seabur 'Cor . , Cotta #2,��� hush ills e <br /> ... <br /> Peggy ollins of BSC, Cape Cod Consultants was present to represent the <br /> applicantso <br /> miss collins explained that they are requesting the same type of work to <br /> e done for unit #1 owned by Ir. Svanoe as for. unit #2 owned by New ea- <br /> bury Corp. She said that cottage #2 will be relocated and put on a full <br /> foundation' and cottage #1 will be moved temporarily and put back on crawl <br /> space foundation. They will both have the sane engineering and land- <br /> scaping. The septic systems are in place. She -explained that unit #1 <br /> cannot be relocated as there is no room to put it back with the other <br /> buildings and permit access o Dorothy asked were the access was in ea- <br /> tion to the cottage? miss Collins pointed out Rock Landings' bound which <br /> is on the north side. <br /> Charlie asked which direction the cottage would be moved while putting <br /> in the frost wall. miss Collins said that it would be moved back -- not <br /> . towards the water side. She also mentioned that minimal landscaping was <br /> involved. <br /> Hearing closed. The following Order of Conditions were drawn up: <br /> Cottage Unit #1 - i illiam S canoe - Wow- shall be in accordance with plan <br /> dated -4/28/83a, Special. conditions were: Because of the severe and con- <br /> tinuing erosion of land along the coastal bank where the above-referenced <br /> cottage is located, the Conservation commission recommends the relocation <br /> of- cottage' #1 to a total distance of 30 feet from the top of the -bank. <br /> This might be accomplished by turning the building. slightly although there <br /> appears to besufficient area to move directly away from the top of the <br /> bank. The septic system must conform to Title V. Cottage will be placed <br /> on a frost wall foundation (crawl space only) . No heavy equipment drill be <br /> used within feet of the top of the bank. Note: over a period of 10 <br /> years the Mashpee Conservation Commission has been regu*red to issue <br /> number of emergency orders regulating work along this shoreline when sever <br /> damage' has occured to the coastal bank. . <br />