My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/9/1986 CONSERVATION COMMISSION Minutes
>
1/9/1986 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2018 5:02:09 PM
Creation date
2/6/2018 9:35:57 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
01/09/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
+i <br /> r4ashpee Conservation Commicsion <br /> Meeting of January 9 , 198 <br /> Page Four <br /> After discussion, an order of Conditions was written ad will be <br /> issued with the following special and it i ons : <br /> 1. Construction of the pier, float , etc . shall be com- <br /> pleted as quickly as possible to minimize the amount of <br /> turbidity and sedimentation. Eel gas beds should be <br /> avoided during construction. Non-leaching wood pre- <br /> servatives must be used for all wood materials . <br /> 2. The propoed boardwalk must be constructed at least <br /> 3.41 above the marsh. <br /> 3. inn /all shellfish destroyed or disturbed must be <br /> repla.ced and replanted immediatel upon completion of <br /> construction. <br /> The fl at must be stored upland from the marsh. <br /> 5. The location of the above-mentioned upland storage <br /> must be documented in writing and sent to the Conservation <br /> Commis =,ion by certified maid. . <br /> 6 . All work must be done by hand. No heavy equipment is <br /> to be used in this construction. <br /> 7. Revegetation must be Ls- imultaneous as th.e work proceeds . <br /> . Replacement vegetats.on muS t be inspected and maintain d <br /> until well-es-t li hes . <br /> 9 . i ork rout be completed before the growing season which <br /> i April to November* <br /> . <br /> A. <br /> 1 . :. g i l t .tion scrgnen must be ins-t al l e d and kept in <br /> lace for the duration of the project. <br /> A. <br /> 4l <br /> _,H r' '� .(Braman Engine e ring om'n y - _-.gent <br /> to construct a 3' x 3041 timber board;rialk , a 41 x 121 timber pier <br /> With attached ' x 121 timber gang-uvay and a lo' x 20' timber <br /> Float t #r39 .'h elhous _ne= . Continued from December 19 , 1985, ) <br /> Pauline DeLor t e,..L down from theBoard- or this hearing as <br />
The URL can be used to link to this page
Your browser does not support the video tag.