Laserfiche WebLink
• <br /> as p e Conservation Commission <br /> Meeting of April 17 , 1986 <br /> Page Six <br /> John T . O' Neil Wm. M. Warwick & Assoc , , Inc Agent) <br /> This application is to construct and maintain a wood-pile pier, <br /> stepsy ramp and float <br /> extending less than 45' into the waters o <br /> Popponesset Creek at Lot #273 Taffrail - Popponesset Islamd, <br /> Chris Clark, re presentative of the agent.t, presentedplans ,, e <br /> - - said this � - - <br /> proposal -will g before the Board of Appeals next <br /> Thursday. The situation is the same as the previous hearing of <br /> Vicki Barletta. <br /> It was mutually agreed bar the representative theest <br /> the bei o and <br /> the Commission present t continue this hearing <br /> to MaY 15t 1986 after the hear" �� <br /> ung bar the Board o� Appeals , <br /> ax~tal e-ire on ent Corn, (Holmes and McGrath, Inc . � exit <br /> This application is to construct <br /> r nrap walls forboth ends of a reinforced concrete pipe at is� <br /> 9 and 10 Ockway <br /> Robert rgmann , representative for the ent , presented la s o <br /> s tated that the ownership of the property e has not changed, <br /> � application pp�ztior� involves projects e c is u �d D ds . SE43-519 and <br /> - <br /> o <br /> E <br /> 43#524. <br /> r <br /> � <br /> The proposal i t install the e r� ad alis s that grading o the <br /> slopes can be finished and vegetated for stabilization, The head <br /> walls in question will be of store set in mortar which wildo 'e t <br /> �.rr� <br /> app 'oxate ly t out o � � wide '� <br /> f the ground ou ��d a. �d will l b 12 � i d e wi th <br /> stone splash-pad at each end . 'there is no normal fl through the <br /> PiPeo It is there strictly for flood conditions , There is no <br /> regular water di zch, There is l fill on top of the pipe , <br /> FIs . Behrman asked how it is Dronosed to stabilize the rest of the <br /> jr <br /> b whlohs i t�: b le�� pe . iIr.. r; � s d a ori <br /> as the he ad#vral I il sfinished , then <br /> they <br /> the# w ? vegetate ' <br /> e slope for <br /> stabilization. They Will also finish <br /> grading 1)El ir cre %7 S tats a• <br /> She is concerned that viEny a, s -cuttinjs in tat rauch fill in he firs' <br /> p 71 a. '. U r j,Ma?ixi Es a d shat i what wGIS MErn the o i <br /> and also what the Order of Conditions allowed . ijlrlial proposal <br /> The base of the fill will comply with the edge of the staked ha <br /> bales s they are � �' questioned � <br /> r in there .. s . rma. questione.� where the extra <br /> fill will be piled . Mr. Burgmann e pi ained that it would be worked d <br />