My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/17/1986 CONSERVATION COMMISSION Minutes
>
4/17/1986 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2018 5:00:46 PM
Creation date
2/6/2018 1:23:03 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
04/17/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-R <br /> t <br /> s <br /> I <br /> Inashpee Conservation COmmission <br /> i <br /> Meeting of April 17 1986 <br /> I <br /> Page Seven <br /> as a 2 - 1 slope the intention being that it would stabilize itself <br /> with vegetation when the pro ~ <br /> Sect is cor leted . � excess <br /> � material <br /> left over will be disposed of by the contractors , <br /> A trenching machine will be used. stones will be rolled over the <br /> edge by hared . The size of the stone will be something that can be <br /> hard carried. <br /> The Chaiorman called for further questions , comments or discussion. <br /> As there were none , she declared the hearing closed and stated that <br /> the matter will be taken ender advisement, <br /> Robert Johnson (CaPe Islands Surveying ing o . , Inc , ) <br /> This application is to construct a pier and piles at Lot #37 <br /> Monomoscoy Road , Assessors ' ,dap o . 124, plot #49 . <br /> David a is� i , representative for the Agent , presented plans . <br /> said that the project is located on Great River. There will <br /> be six piles . The pier is 41 x 6o' . ' will extend outward <br /> from mean low water mare into the River* Piles will be driven, <br /> Any damage or disturbance to the upland side will be restored to <br /> its present condition. Presently, the land back from the house <br /> to the water zsras <br /> g • <br /> Ms . Behrman said that the area was not properly staked to facilitate <br /> on-site ins D c t i ori. She noted that no dimensions were given on <br /> the Notice o Intent for the pier, This is es-oeciallyunfair to <br /> abutters who have no idea as to the extent of the project, <br /> The members expressed a great deal of concern as to how many <br /> boats will be using the door. he number of tiles seems to indicate <br /> that several boats may e us ung ; t, �e ,fanic i ,fid not know how <br />` nivauny boats were going to be s#ng i t . There are -o l e on both sides . <br /> Mr. anlck noted the el � at .�n of the water is .3 ' , 2v1,Ff N <br /> dredging is proposed. 'There is 2 ' of water, :fl-r, anicki said he <br /> could a t:most r-ruarante e that t 4n ere would be no big boats . there <br /> was still concern expressed 07Sr the number of pees . There are <br /> twelve piles if one counts back to the proposed steps , <br /> Vernon: Thomas , shellfish Commizzion, Preserg;te a i ture of the <br /> propos ed area for c n tfi_�ct .:; . He said that did not indi <br /> cafe ± here the VvE <br /> ater recedes . je ind'Icoatend IBM!, I #sere EL set Of clams <br />
The URL can be used to link to this page
Your browser does not support the video tag.