Laserfiche WebLink
Mas pee Conservation C m ssi n <br /> Meeting of May 1, 1986 <br /> Page Six <br /> The parking area will be a crushed stone surfa.c e. <br /> There will be no catch-basins . The perimeter of the area becomes <br /> a "catch surface" . <br /> Mr. Rosenberg stated that the Board needed a plan which shows , <br /> definetely,ever t ing that is intended to be done for this project. <br /> The statement was supported unanimously. <br /> . Van T01-1 and lir. Govonni retired to amend the plan this evening, <br /> The hearing was continued to later in the meeting. <br /> mob e t Lappin (Braman Engineering Company - Agent <br /> This application is to construct a pool with attached decks , <br /> various plantings and chain link fence at Lot #37 wheelhouse Lane , <br /> The h -Xring I', S c* '--tikeaed c4�_:1 .0 � 1986 . <br /> Douglas Cameron , representative of the Agent , presented new plans <br /> with a plan from architect showing landscape applications . He <br /> said that the fence line has been staked . Some excavation will be <br /> required . A temporary accesswa r for co �struction equipment will <br /> e built . .,Dome clearing will e required to make the acres way. <br /> ertili er, will not be used . <br /> Mr. Cameron submitted a plant list and information regarding the <br /> stability of the bark due to the proximity of the pool.. <br /> The existing greenhouse will be removed. <br /> A <br /> After discussion, as there were no further comments or questions , <br /> the Chairman declared the hear-ing closed and stated that the matter <br /> would be taken under advisement . <br /> Certificate of Compliance will be issued to New Seabury Corp. <br /> regarding 743 -316 stating that the Agent , BSC Cape Cosi Survey <br /> onsulta. is , has given written notice that the pro ect i ala d- <br /> oned and incomplete , No work what8oever is to take place under <br /> this filing, <br />