Laserfiche WebLink
Conservation Commission <br /> Meeting of July 1 , 1986 <br /> Page 4. <br /> John 0. Harri s , Lot B. Janes C 1 rcl e Co nti need <br /> Ms Behman questioned the necessity of clearing 25 feet in front of the deck <br /> to the silt barrier staked hay bales . The whole lot is going to be clear.-cut <br /> on a very steep sl cpe with the pond in the condition it i s . <br /> Mr, Bergman stated the regrading is to maintain a uniform slope and to provide <br /> that swat a to contain the water. <br /> TAKEN UNDER ADVISEMENT, <br /> T, <br /> Wm. Fitzgerald, 82 Summersea Rd. , A & B Cando-Agent. An abbreviated Notice of <br /> Intent was filed to install three flow diffusers with washed packed stone to be <br /> located equidistant from two wetland edges . This was the subject of a request <br /> for an emergency order. This is an existing failed system they are asking to <br /> repair and has been approved by the Board of Health and the Health Agent will <br /> be present during the installation. <br /> Ms Behman c r ented that an on-site was done and that is the only possible <br /> place to put the flow diffusers. <br /> TAKEN UNDER 'ADVISEMENT. <br /> Wil l i am Saccone, Lot 15 Meadowbrook Rd. Cape & Island Surveyors-Agent. John <br /> a i n y resenting. To construct a single family residence, septic system <br /> and well . The set back is in the covenant nt of the subdivision at 40 feet-. The <br /> house is set at 42 feet. The deck is within 65 feet of a vegetated wetland. <br /> There is a master plan on file locating proposed well and septic. Hazy bal es <br /> are proposed along the work limit feet from the deck and also with the pro- <br /> posed well . An 8 foot. width is to be cleared. <br /> Concerning the question of the installation of the well , Mr. Slavinsky stated <br /> the Commission could write that into the Order of Conditions as desired. <br /> An abutter, Clyde Miller of Red Brook Rd. , stated his family will be putting <br /> in three wells directly in back of the well being put in and he is concerned <br /> with the draw down and suggested moving the proposed well 10 feet, Mr. <br /> Sl avi ns ky stated M shpee has a 150 foot requirement between well and septic. <br /> This well is 152 feet. Also, there is a 10 foot r q i rernent from all prop- <br /> erty The septic is exactly 10 feet. <br /> The chairman advised Mr. Miller's concerns should be addressed to the Board <br /> of Health. <br /> Mr. 1larkonda question the staking of the work limit and stated he would like <br /> to see it on less of a steep grade. Mr. Slavinsky stated everything is done <br /> on a topo by others and they located the edge of the Zetland. <br /> 'Ms . Behr r n suggested moving the work limit S feet towards the road. 3 feet <br /> from the edge of the deck in order that erosion from the cleared land does <br /> not pile up behind the hay bales and overflow. Mr. Sl avi n ky agreed to do <br /> this. <br /> TAKEN UNDER ADVISEMENT. <br />